My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005705
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/29/2020 1:18:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005705
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> • to prevent overheating and failure of the vacuum pump Placement of the air/water separator upstream of <br /> the vacuum pump prevents carryover of silts or sediments into the pump For sites with floating product, <br /> an oil/water separator may also be required <br /> Vapor and liquid treatment processes are designed to conform with air emission and water discharge <br /> requirements Common vapor treatment technologies used at DPE sites include carbon adsorption and <br /> thermal or catalytic oxidation Water is often treated using air stripping and/or liquid granular activated <br /> carbon (GAC) adsorption, as required <br /> Extraction system materials of construction are determined based on contaminant types and concentrations <br /> ' and on economic factors Commonly used materials of construction include stainless steel,PVC, and <br /> HDPE __- - - - -- -- - — ---- - - - <br /> 4.31.4 System Monitoring <br /> Parameters monitored during full-scale DPE system operation typically include vapor,groundwater, and <br /> product recovery rates, system and wellhead vacuums,extracted vapor and groundwater contaminant <br /> concentrations, and other parameters required of the vapor and water treatment systems At sites with <br /> ' aerobically biodegradable hydrocarbons,extracted vapors may also be monitored for parameters related to <br /> in situ bioactivity, such as methane,carbon dioxide and oxygen In situ respiration tests may also be <br /> conducted to assess the extent of bioremediation occurring <br /> ' 4.32 Dual-Phase Eitraction System Characteristics <br /> This subsection discusses design and operating features of each type of DPE and the unique benefits and <br /> drawbacks of each type of system <br /> ' 4.3.2 1 Drop-Tube Entrainment Extraction <br /> ' Drop-tube entrainment DPE systems are constructed by inserting a suction tube into the sealed wellhead of <br /> an extraction well As vacuum is applied to the suction tube, soil vapor entering from the unsaturated soils <br /> ' entrains groundwater at the tube tip Soil vapor and entrained groundwater are transported in a common <br /> • 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.