My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005706
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/29/2020 1:19:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005706
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BROWN AND CALDWELL <br /> SITE SAFETY AND HEALTH PLAN <br /> Site Description <br /> T & T Trucking is located at 11369 North Highway 99 in Lodi, California The site is an <br /> active trucking terminal, where trucks are stored, staged, and fueled <br /> Protect Objectives <br /> The purpose of the work will be to determine the lateral and vertical extent of petroleum <br /> hydrocarbons, if any, in the soil and groundwater on-site <br /> Field Activities <br /> I <br />' Field activities will include the drilling, sampling, stockpiling, and remediation of any <br /> petroleum hydrocarbon-affected soil and groundwater Personnel on-site will include one BC <br /> geologist, two to three subcontractor employees, and occasionally other personnel from BC or the <br /> regulatory agencies This site safety and health plan (SSHP) is valid December 31, 1997 to <br /> December 31, 1998 <br /> KEY PERSONNEL AND RESPONSIBILITIES <br />' Ms Tina M Bauer is the project manager (PM) Ms Anne Baptiste, Certified Industrial <br /> Hygienist (CIH), is the health and safety director (HSD) Ms Tina M Bauer or Ms Wendy Linck <br /> are the project geologist/engmeers and will also function as the site safety officer (SSO) The <br /> project field staff have completed 40 hours of comprehensive health and safety training which <br /> meets the requirements of Title 29 Code of Federal Regulations Part 1910 120 (29 CFR 1910 120) <br />' The SSO has the authority to monitor and correct health and safety problems as noticed on site <br /> PM Responsibilities <br />' The PM is responsible for generating, organizing, and compiling the SSHP which describes <br /> all planned field activities and potential hazards that may be encountered at the site The PM is also <br /> responsible for assuring that adequate training and site safety bnefing(s) are provided to the project <br /> field team The PM has provided a copy of this SSHP to each member of the project field team and <br /> one copy to each subcontractor prior to field activities <br /> E 1627 t%SSHP DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.