My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005502
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
3500 - Local Oversight Program
>
PR0545626
>
ARCHIVED REPORTS_XR0005502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/29/2020 1:37:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005502
RECORD_ID
PR0545626
PE
3528
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' impact is estimated to be 200 feet by 150 feet, in the west end of the site (see <br /> Figure 1) Histoncal analytical results are included in Attachment B <br /> 4 Potential impact of the wastewater discharge on containment and rate of <br /> movement of groundwater plume <br /> Containment of the groundwater plume will not be adversely affected by the <br /> reinfection system The gradient of groundwater flow will be increased <br /> ' between the infection wells and the extraction wells, but since the injection <br /> wells will be located outside (and upgradient) of the groundwater plume, the <br /> discharge water will act to direct the plume towards the extraction wells The <br /> ' direction of groundwater flow and movement of the groundwater plume will <br /> be monitored in wells MW-5 through MW-9 <br /> 5 Effect of groundwater extraction_system on the groundwater_gradient and <br /> plume <br /> _ <br /> ' As shown on Figure 3, the projected area of influence for the extraction <br /> system encompasses the groundwater plume EMCON estimates that within <br /> 30 days the gradient of groundwater flow within the influenced area will be <br /> redirected toward the extraction wells The direction of groundwater flow and <br /> movement of the groundwater plume will be monitored in wells MW-5 <br /> through MW-9 Modifications to the extraction system will be made, if <br /> necessary, based on the observed conditions in the groundwater monitoring <br /> wells <br /> ' h Anticipated extraction time <br /> Estimated 2 years <br /> c' <br /> ',ACfpf--I\2'520\:5201000 1L1-94 ifs H 4 Rev 0 September 15 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.