Laserfiche WebLink
Mr Jerry Moore Project 2520-100 01 <br /> October 11, 1994 <br /> Page 3 <br /> ADDITIONAL ACTIVITIES <br /> EMCON is in the process of obtaining permits to install the soil vapor and groundwater <br /> remediation system <br /> LIMITATIONS <br /> The services described in this report were performed consistent with generally accepted <br /> professional consulting principles and practices No other warranty, express or implied, <br /> is made These services were performed consistent with our agreement with our client <br /> This report is solely for the use and information of our client unless otherwise noted Any <br /> reliance on this report by a third party is at such party's sole risk <br /> If you have any questions, please call <br /> !yam a <br /> Sincerely, - " <br /> tR I:1f <br /> EMCON Associates JULIA P1 C is <br /> 132 1 <br /> EU! <br /> Harold R Duke C Isham <br /> Project Manager eology Manag !F CAL, <br /> E G 1321 <br /> Attachments Table 1 Groundwater Elevation Data <br /> Table 2 Groundwater Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Groundwater Contour Map, September 2, 1994 <br /> Figure 3 Benzene Concentration Map, September 2, 1994 <br /> Attachment A Sampling and Analysis Procedures <br /> Attachment B Certified Analytical Results and <br /> Chain-of-Custody Records <br /> cc Margaret Lagorio, San Joaquin Public Health Services/Environmental <br /> Health Division <br /> Barry Newman, Central Valley Regional Water Quality Control Board <br /> SAC/PJ2\2520Q5201000 1d1-44 tfc 2 <br />