Laserfiche WebLink
uG f1 <br /> • Mr. Jerry Moore Project 2520-100.001 <br /> April 14, 1995 <br /> Page 4 <br /> LIMITATIONS <br /> The services described in this report were performed consistent with generally accepted <br /> professional consulting principles and practices. No other warranty, express or implied, is made. <br /> These services were performed consistent with our agreement with our client. This report is <br /> solely for the use and information of our client unless otherwise noted. Any reliance on this <br /> report by a third party is at such party's sole risk. <br /> If you have any questions, please call. <br /> Sincerely, <br /> EMCON Gr'`il 0,�v`v <br /> 13211 <br /> . CEftTfFfffl � <br /> Harold R. Duke J. . Isham N ENGINEERING <br /> Project Manager G ology Manager Jy rEotosisT �Q <br /> E.G.1321 l��f CALY���� <br /> Attachments: Table 1 Groundwater Elevation Data - <br /> Table 2 Groundwater Analytical Results <br /> Table 3 Groundwater Extraction and Treatment System <br /> Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Groundwater Contour Map, February 21, 1995 <br /> Figure 3 Benzene Concentration Map, February 21, 1995 <br /> Attachment A Sampling and Analysis Procedures <br /> Attachment B Certified Analytical Results and Chain-of-Custody <br /> Records <br /> Attachment C Source Test Field Data Sheets <br /> Attachment D Source Test Analytical Results <br /> Attachment E Exploratory Boring Logs and Well Construction Details <br /> Attachment F Drilling and Monitoring Well Installation Procedures <br /> cc: Margaret Lagorio, San Joaquin Public Health Services Environmental Health <br /> Division <br /> Barry Newman, Central Valley Regional Water Quality Control Board <br /> i <br /> SA[1N-\PJ2\2520\25201000.1 PS-94\11b:1 <br />