Laserfiche WebLink
Ms Margaret Lagorio Project Z298 00 <br /> April 28, 1994 <br /> Page 3 <br /> Consistent with the approval of Aegis FRP by PHS/EHD, EMCON intends to use the <br /> existing ventilation fields along with monitoring wells MW-4 and MW-3 to address the <br /> vadose zone impact, and monitoring wells MW-1 through MW-4 to address the <br /> groundwater impact EMCON believes that the SAVE system can be used to remediate <br /> the soil and groundwater at the site The SAVE system will be operated in compliance <br /> with San Joaquin County Air Pollution Control District (SJCAPCD) and the California <br /> Regional Water Quality Control Board (CRWQCB) permits to operate <br /> As the next step towards remediation of the site, EMCON will subrrut an application for <br /> Authority to Construct (AOC) the SAVE system by the first week of June 1994 to the <br /> SJCAPCD If you have any questions please contact us <br /> Sincerely, <br /> EMCON Associates <br /> *' arold R Duke Te Bonham, P E <br /> Project Manager Vi e President <br /> cc/att Kendall Person, Federated Insurance <br /> Jerry Moore, Moore Petroleum <br /> I�trcknos\Z278OOb-94 mam 2 <br />