Laserfiche WebLink
li <br /> OwrtarN Groundwater Monitoring Report <br /> R� �} FouM Quarter <br /> 14800 West Frontage Road Manteca Galdomia <br /> BACKGROUND <br /> Work performed at the site by previous consultants included investigations by Earth <br /> Treatment Systems, Inc (ETS), of Merced, California, Delta Environmental Consultants, <br /> Inc (Delta), of Rancho Cordova, California, and Nations Groundwater Associates of <br /> Sacramento, California In August 1988, MW-1 and MW-2 were installed by ETS In <br /> April and May 1989, Delta installed MW-3 and MW-4 In November 1989, Delta <br /> conducted soil sampling during the removal of three 10,000-gallon underground fuel <br /> storage tanks Delta installed MW-5 through MW-8 in November and December 1989 <br /> Aegis began a program of monthly monitoring and quarterly sampling of the wells in <br /> January 1991 In November 1991, Aegis supervised the drilling and completion of MW-9 <br /> (Figure 2) The previous consultants' groundwater data, along with Aegis' data, are <br /> included in Table 1 <br /> GROUNDWATER MONITORING <br /> On November 10, 1993, Aegis personnel collected measurements of depths to <br /> groundwater from the nine wells Since the last monitoring event in July 1993, <br /> groundwater levels have increased in wells MW-1, MW-4, MW-6, MW-7, and MW-9 an <br /> average of approximately 0 13 feet and have decreased in wells MW-2, MW-3, MW-5, <br /> and MW-8 an average of approximately 0 42 feet (Figure 3) Figure 4 is a potentiometric <br /> surface map of the shallow water-bearing zone on November 10, 1993 On the basis of <br /> the current measurements, the groundwater flow direction is estimated to be generally <br /> to the southeast, at a gradient of approximately 0 001 ft/ft During the July 1993 sampling <br /> event, groundwater flow was estimated to be toward the northeast <br /> Groundwater measurements are summarized in Table 1 All groundwater elevation <br /> measurements were made according to the Aegis standard operating procedures (SOP) <br /> included in Attachment 1 <br /> WATER SAMPLING AND ANALYSIS <br /> On November 10, 1993, Aegis personnel collected groundwater samples from the nine <br /> wells The samples were collected according to the Aegis SOP included in Attachment <br /> 1, and submitted under chain-of-custody to Pace Inc , of Novato, California, a state- <br /> certified analytical laboratory The samples were analyzed for concentrations of <br /> • total petroleum hydrocarbons (TPH), as gasoline, by modified EPA Method <br /> 8015, <br /> • benzene, toluene, ethylbenzene, and total xylenes by EPA Method 8020, <br /> • TPH, as diesel, by EPA Methods 3510/8015 (MW-1 through MW-4 ) <br /> 90.097H QMR 2 <br />