Laserfiche WebLink
MONITORING WELL DATA TRANSFER <br /> 2nd Quarter 1993 <br /> Project # 90-097 Client Federated <br /> Location Moore Petroleum - 14800 W Frontage Rd Contact Gail Clark <br /> City Manteca Address <br /> Facility# 83Z-159 <br /> Project Manager Laura Odenthal Phone & Fax <br /> Lab/Contact Pace Inc <br /> Lock/Key Master 0909 Special Notification Notify San Joaquin <br /> Survey (TOC/TOB) Cnty 48-hrs prior 2091468-3420 <br /> Date Report Due to Lead 3 wks after sampling event <br /> Date QMR due to Agency 15 days following end of qtr Date Scheduled Week of Apr 5,1993 <br /> Monitored Frequency Quarterly <br /> Well Measured Depth to <br /> Diameter Total Depth Water Analyses Requested Additional site requirements <br /> Well ID (inches) (feet) (feet) (EPA Methods) (FP, hailing, skimmers, etc ) <br /> Site Protocol <br /> MW-7 20 35.63 3055 3 casing volume purge <br /> MW_9 40 30.78 31 94 ___ Record pH, EC, remperaiure and <br /> MW-6 2,0 38.79 3145 ~ �� -~`�� Record number of drums on site, & estimated <br /> MW-8 20 39.12 34.56 'J quantity in each <br /> MW-5 2,0 3 .80 33,12 DW-1 `7 <br /> MWT2 20 44.10 3371 <br /> MW_3 2,0 44.80 3421 <br /> MW-1 20 47.90 33.81 <br /> MW-4 10 36,68 32,43 <br /> +��)DW-1 �{C�� <br /> , 1 � l <br /> l;C��. DC- <br /> NOTES <br /> �U Wells are listed in the order they are to be sampled <br /> COMMENTS — f <br /> Please verify the above infor ion If to information is missing or incorrect, please make note <br /> Please sign and date for ap 9 al and n S P t D n Col <br /> S nat a Vto <br />