Laserfiche WebLink
r <br /> Addendum to Quarterly Groundwater Monitoring&Remediation Status Report <br /> dated September 25,1995 <br /> Moore Petroleum, 14800 W Frontage Rd.,Manteca,CA <br /> January 9, 1996 <br /> Page 5 <br /> TABLES <br /> TABLE 1 RSI UNIT VAPOR EXTRACTION OPERATING DATA <br /> TABLE 2 SUMMARY OF MASS EXTRACTION RATES BASED ON <br /> LABORATORY ANALYTICAL RESULTS FOR RSI UNIT <br /> TABLE 3 WATER TREATMENT SYSTEM OPERATING DATA <br /> TABLE 4 SUMMARY OF MASS EXTRACTION RATES BASED ON <br /> LABORATORY ANALYTICAL RESULTS FOR <br /> GROUNDWATER TREATMENT SYSTEM <br /> ATTACHMENTS <br /> ATTACHMENT 1 LETTER FROM SAN JOAQUIN COUNTY <br /> ATTACHMENT 2 ANALYTICAL RESULTS GROUNDWATER <br /> MAY 9, 1995 <br /> ATTACHMENT 3 ANALYTICAL RESULTS OBTAINED FROM EMCON <br /> ATTACHMENT 4 SAMPLE CALCULATIONS <br />