Laserfiche WebLink
TABLE 3 <br /> WATER TREATMENT SYSTEM OPERATING DATA <br /> MOORE PETROLEUM <br /> 14800 W.Frontage Road <br /> Manteca,CA <br /> FLOW TOTAL <br /> DATE RATE FLOW CONM ENTS <br /> GPM) GALLONS <br /> 1/23195 2 226* Water samples collected for awlysis <br /> 2114/95 2 30,325* ✓ Water samples collected for analysis <br /> 2121195 2 31,448* ✓ Water samples collected for analysis <br /> 2/28/95 16 31,958* ✓ Water samples collected for analysis <br /> 318195 16 51,511 * <br /> 3/13/95 1 6 76,000* <br /> 3/20/95 0 NM System off for repairs <br /> 3/27/95 0 128,194* System off for repairs <br /> 4/3195 0 128,194* System off for repairs <br /> 4/10/95 0 128,194* System off for repairs <br /> 4/17/95 0 128,194* System off for repairs <br /> 4/24/95 NM 85,445 System restarted after repairs <br /> 5/1/95 NM 116,558 <br /> 518/95 NM 146,946 <br /> 5/9/95 3 0** NM Water samples collected for analysis <br /> 5/15/95 NM 175,440 <br /> 5/22/95 NM 183,128 System off for repairs <br /> 06/13/95 NM 183,128 Unit repaired and restarted <br /> 06/15/95 NM NM <br /> 06/21/95 NM 233,038 <br /> 06/24/95 NM 239 457 <br /> 07/05/95 NM 243,414 <br /> 07/10/95 NM 264,560 <br /> 07/17/95 NM 296,672 <br /> 07/24/95 NM 329 490 <br /> 07/25/95 2 75*** 333,474 Water samples collected for analysis <br /> 07/31/95 NM NM <br /> 08/04/95 NM NM <br /> 08/16/95 25 382,843 Water samples collected for analysis <br /> 08/21/95 0 392,425 System shat dawn for carbon replacement <br /> 08/30/95 30 392,650 <br /> 09/12/95 28 436,761 <br /> i <br /> * = Total flow readings prior to and including 4-17-95 measured from eluent flow gauge <br /> Total flow readings after 4-17-95 measured from influent flow gauge aIJ-, <br /> ** = Based on total flow measurements for week of 5-01-95 through 5-08-95 <br /> *** = Not measured,based on average recorded flow rate as of 9/12/95 of 2 75 GPM <br /> i <br /> APEX ENVIROTECH,INC <br /> THIRD QUARTER 1995 <br /> ERA02 009 <br />