My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10217
>
3000 – Underground Injection Control Program
>
PR0523720
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:07 PM
Creation date
4/30/2020 11:09:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523720
PE
3020
FACILITY_ID
FA0015999
FACILITY_NAME
RENTAL UNITS
STREET_NUMBER
10217
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
12204013
CURRENT_STATUS
01
SITE_LOCATION
10217 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/17/2005 13:25 209951009' CHAMPAGNE PAGE 03 <br /> e2/1512005 16:49 20946' B 51 LK0.K I LXv <br /> 15 >+ebruary 7005 <br /> A()E NC Proposal No.04-2788 <br /> Page 2 of 3 <br /> 2.0. COST <br /> The estimated cost for the above services hill be $11,839.00.A deposit of,S5,000.00 is required <br /> upon authorization; the balance will be due and payable upon receipt of laboratory analysis and <br /> report completion No additional work will be performed without prior authorization from the <br /> Client. <br /> 3.0. EXCLUSIONS <br /> lQ <br /> The followingitems are not included in this proposal: 1)Additional soil or water safnpling andlor <br /> atl*sis beyond scope of work; 2)Regulatory oversight fees;3)Additional regulatory or remedial � <br /> action requirements;4)Excavation of the septic system sampling ; )Repairs to septic system �} <br /> due to damage during excavation;6)Other costs not specifically state in a scope o wo C4,r <br /> 4.0. ASSUNJIPTIONS <br /> This proposal assumes the following: 1) Access to the site will be sc the 'art; 2) All �. <br /> activities at the site can be performed during normal working hours; 3) All costs incurred due to <br /> regulatory directives, afteT this proposal, shall be assutned by the Client; a) Client bas submitted <br /> Master pile Record and required regulatory fees to SJCEHD; 5) Water and electricity will be <br /> available at the site; 6) Proper cleaning of septic tank can be achieved through access covers: 7) <br /> Regulatory approval of the work plan. <br /> 5.0. SCHEDULE <br /> The work outlined in this proposai can be initiated upon receipt of authorization to proceed from the <br /> Client and payment of the deposit. A.work plan will be submitted to SJCEHD within 72 hours of <br /> authorization to proceed. <br /> 6.0. 1GIlVIITATIONS <br /> Should them be arty regulatory objections to the project of unanticipated regulatory requirements, <br /> only the fees for services performed to that time will be billed based on our Standard Schedule of <br /> Charges. Should the regulatory agencies require additional monitoring or other services beyond the <br /> scope presented herein,the scope of work will need to be expanded at an additional.cost submitted <br /> A!waftWQs$jWf "W0W &r.r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.