Laserfiche WebLink
Odic Environmental <br /> Page 3 of 4 <br /> • Total Petroleum Hydrocarbons as gasoline and diesel by EPA Test Methods 8260B and M8015; <br /> • Benzene,toluene,ethylbenzene and total xylenes(BTEX);and fuel oxygenates by EPA Test <br /> Method 826013;and <br /> • Total Lead by EPA Test Method 6010/7000 series. <br /> Reporting: <br /> Upon completion of the Phase II Investigation,a report will be prepared to document the methods used, <br /> actual boring locations,results and conclusions. All supporting documentation including boring logs, <br /> laboratory reports and chain-of-custody documentation will be included. Site maps will be prepared to <br /> illustrate the distribution of any identified contamination. <br /> Pre-drilling Activities <br /> • Perform Site Visit to verify existing conditions and pre-mark boring locations and notify Underground <br /> Service Alert(USA)of the intent to excavate or drill and use standard care to avoid potential damage <br /> to subsurface utilities. <br /> • A Site-specific Health and Safety Plan(Level D Health&Safety according to OSHA CFR 1910.120, <br /> will be prepared. <br /> • San Joaquin County Drilling permit <br /> Field Investigation <br /> • A limited access push probe rig with a licensed operator will be mobilized to the site to complete the <br /> proposed scope of drilling and sampling activities.All down-hole sampling equipment will be cleaned <br /> before starting a soil boring,with a non-phosphate detergent and water before each use. <br /> • This bid proposal includes cost for mobilization and demobilization,liners,bentonite,asphalt patch,fuel, <br /> and tubing. Odic will backfill each boring with bentonite pellets. Each borehole will be <br /> abandoned/filled with bentonite,and restored to pre-drilling condition via applying patching materials. <br /> • Collect soil samples at 5-foot intervals,or at significant changes in lithology.Attempt to collect the <br /> lowermost sample at or immediately above the groundwater level if groundwater is encountered during <br /> drilling. <br /> • If groundwater is encountered grab samples may be collected down hole(either through the drive rods <br /> or temporary installed 1-inch PVC well screen)using a peristaltic pump and disposal polyvinyl tubing <br /> under low flow conditions. <br /> • Monitor the headspace of each sample for the presence of volatile organic compounds using a photo- <br /> ionization detector(PID)or flame-ionization detector(FID). <br /> • The soil boring will be logged using the Unified Soils Classification System under the supervision of <br /> ODIC's State Professional Geologist(PG)or Registered Professional Engineer. <br /> • Submit 16 soil samples for analysis of TPH as gasoline and diesel,BTEX,MTBE and fuel oxygenates, <br /> and Total Lead via EPA Methods 8015,8260,and 6010. <br /> Data Evaluation&Reportine <br /> • Prepare a report to document the methods used and present the results of our investigation.Based on <br /> the results,present our conclusions and provide recommendations for further investigation and/or <br /> remediation. <br /> • Report shall be prepared by State Registered Geologist and reviewed by State Registered <br /> Environmental Assessor. <br /> • Report shall contain boring log,site plot plan,site location map,regional hydrogeology,laboratory <br /> reports&chain of custody. <br />