Laserfiche WebLink
Yes No Comment <br /> Generation Points ("Satellite Accumulation") <br /> (Reference 25123.3 and 66262.34(e) ) <br /> Has the generator accumulated HW at or near the <br /> point of initial genEration without meeting <br /> storage deadlines prcvided they accumulate no more <br /> than *55 gallons of EW or one quart of acutely or <br /> extremely HW, and: [66262.34(e) (1)-] <br /> (A) The waste is aocxmilated in containers at or <br /> near the area where 3enerated and which is under <br /> the control of the ooerator of the process? <br /> (B) The waste is heli on-site for no more than <br /> one year, nor more tian 90 days from reaching <br /> applicable quantity imits? <br /> (C) The initial date of accumulation is clearly / <br /> marked and visible f r inspection on each / <br /> container? _ V <br /> (D) The HW is fit° le with the container used <br /> for accumulation and the container is kept closed <br /> except when necessary to add or remove waste? <br /> (E) The generator lies with <br /> 66262.34(e) (2) , (3) and (f) (3)? — �/ m -ev► <br /> * Note: If the generator has determined that not all wastestreams generated by a single <br /> process or group of processes in the same physical area are conpatible, the generator may <br /> apply a separate 55 gal. or 1 qt. limit to each group of ccupatible wastestreams. <br /> (Reference 66262.34(e) (2) (A) ) <br /> Also, if the generator determines that using only one 55 gal. or 1 qt. container to <br /> initially accumulate specific compatible wastestreams is not practical or safe, the <br /> generator may use a separate container for those specific compatible wastestreams <br /> (although this determination is subject to review and approval by the Department at any <br /> time) . (Reference 66262.34(e) (2) (b) ) <br /> Once the generator has accumulated an amount of HW <br /> equal to any applicable quantity limitation listed <br /> in 66262.34(e) (1) , has the generator, with respect <br /> to that waste, within three days, labelled the <br /> container with the date the quantity limit was <br /> reached and complied with 66262.34(a)7, ` <br /> [66262.34(e) (3) ] \---- �'ldT 1M��°�c�, <br /> 0� <br /> _90 Day Accumulation -ec-7 <br /> (Section 66262.34) <br /> If the generator does not have a permit or interim <br /> status (as a TSD facility) have they accumulated <br /> HW on-site for less 90 days (except as / <br /> provided under 66262.34(d) )? [66262.34(a) ] —✓ <br /> NOTE: For generators c f not more that. 100 kg/mo. of HW nor 1 kg/mo. of acute or extremely <br /> HW, the 90 day period begins on the date the generator has accumulated 100 kg (or 1 kg) . <br /> (Reference 66262.34(b) and 25123.3(b) ) <br /> Revised 7/15/91 Page 4 <br /> ��J <br />