My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3995
>
2900 - Site Mitigation Program
>
PR0522133
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:07 PM
Creation date
5/1/2020 8:56:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522133
PE
2950
FACILITY_ID
FA0015088
FACILITY_NAME
DEL VALLE HOMES
STREET_NUMBER
3995
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
952158027
APN
17918025
CURRENT_STATUS
01
SITE_LOCATION
3995 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/10/2003 12:39 2095224227 GEOLOGICAL TECHNICS PAGE 01/01 <br /> r A x <br /> T R A N 5 M I r T A L <br /> FROM: Jenny Weese, Office Manager CeologcCaI Technics Inc. <br /> DATE: December 10,2003 11017 1b Street(office) <br /> Modesto, CA 95354 <br /> TIME: 12:30 p.m. <br /> Phone: 209/522-411.9 <br /> #Pages: 2 (including this page) <br /> Fax: 209/522-4227 <br /> X Fax only <br /> Original to follow in mail <br /> TO: Michelle Wade, Del Valle Homes <br /> Lori Duncan. <br /> Fax#: 209-550-7373 <br /> 209-468-3433 <br /> MESSAGE: <br /> The following drilling schedule pertains to the Del Valle Site located at: <br /> 3995 S. Hwy 99 <br /> Stockton, CA <br /> DRILLING DATE: <br /> December 30, 2003 —2 geoprobes(2 samples each geoprobe) <br /> Project Geologist: Ray Kablanow, Geological Technics <br /> Contact Number: 209-522-4119 <br /> Drilling Com an : V&W Drilling <br /> Permits: San Joaquin County: Pending, sent to County 12/3/03 <br /> Start Time: 10 a.m. <br /> Workplan: November 18,2003 <br /> Please call if you have any questions. Please see attached map for boring and well locations. <br /> Note: Lori, turns out the work plan does discuss using V&W Drilling, I just made the mistake thinking <br /> it -vas going to be hand augers and filled out the permit incorrectly. Ray noted on page 2 of the <br /> November 18 work plan (4th paragraph) that we will collect two samples per borehole. One at fifteen <br /> feet and the other at 24 feet below grade. Please let us know if this is not acceptable, otherwise, we will <br /> do work as noted in the work plan. Thanks!! <br /> Please Note: The information contained in this facsimile message may be privileged or confidential, and is intended only <br /> for the use of the individual named above and others who have been specifically authorized to receive it. If you are not the <br /> intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is hereby <br /> strictly prohibited. If you have received this communication in error, or if any problems occur with transmission, please <br /> notify us immediately by telephone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.