Laserfiche WebLink
- - - — -- ------- - -- ---- --- EQUIPMENT LIST <br /> DESCRIPTION MANUFACTURER MODEL / T � <br /> PROPERTY LINT 1 42' DIAMETER MULTI-PORT SPILL .,ONTAIVMENT MANHOLE k FRAME POMECO 521 05716-M- 154042RT052 <br /> — — 2 PHASE I BRONZE SWIVEL ADAPTER W/ OPW " 495 NIPPLE OPW 61VSA-EVR 61VSA- 1020-EVREXSTING I TRASH ENCLOSURE 3 PHASE 1 VAApPO(IX;t TOP SEAL CM { Ny1 pµypN (WW 1711E-TVR 17117-7063 <br /> O FIRION. W RAN RE SPLUG `CPN } 1DK 2100' �EOD 511 511C-PENT <br /> 5 FACE SEAL ADAPTER, PHASE I RISER, ATG RISER, k FILL RISER OPW FSA-40O FSA-400 J now Q > O <br /> a FBRONZE SWIVEL ADAPTER W/ OPW /FPN 4x7 NIPPLE OPW a1SALP—EVR 61SAiPTVR- 1020— J E • — >` M <br /> (E) <br /> FREEWAY SKIN LL g • N p Ln <br /> VEEDER-ROOT TIS-350 7 FILL TOP SEAL CAP OPW 634TT-EVR 634TT-7085 �. •>_ <br /> MONITOR SYSTEMUj too, <br /> ® L� 5%LL NN VIA VE 5 GALLON CAST IRON, POMECO 511 511C-DEUR a � O <br /> NEW OVERFILL ALARM W/ E7OSI11 VENT RISERS I 9 / SCREW ASSEMBLY N FILL BUCKET OP'A a1JSK-M00-EVR 81M-4400-EVR U o <br /> 1ACKNOWLEDGMENT SWITCH o e o 7 13 0 STRAIGHT FILL DROP TUBE OPW 81T 61T-736a E •� •n' � <br /> L <br /> 11 FITTING, DORACTOR, TEL 4"(4"(3'X3' OPW 233 233W-4433 0 = -1-- � <br /> 1 TANK GAUGE PORT COMPONENTS (CAP k RING KIT) MORRISON BROS. 305XPA1 IOOAh EVR 305XPAI IO OAKEVR to � C <br /> o 0 O 13 THREADED PRESSURE VENT CAA DPW 623'V 623V- <br /> UM-32203 2 L <br /> 1i NOT usm U En <br /> 15 3' % 12' BALLFLOAT DPW ONML-3120 5NUL-3120 <br /> 0 <br /> EXlSTIflG BUILDING 16 WATER SHIETD OPW PWwS MP#5--33 33' TOP HA U = T <br /> ® O MPWS-38 38' TOP HA •0 <br /> 77 RISER SUPPORT OPV/ 851 1 —Em1a 051 1 -R61a � M <br /> O 1a OVERFILL ALARM WITH HORN/STRCBE 120VAC, VR-790091 —DD1 SW84 U) � N <br /> ACKNOWLEDGE SWITCH, k AUTOMATIC IAN( GUM �-� VR-790O95-001 SWITCH Lp <br /> 89 UW.EADED VR-647390-10X TANK GAUGE <br /> I o m U <br /> 91 SUPER <br /> o v <br /> I <br /> EXISTINGTURBINE I II II <br /> EXISTING E.S.O.� I - I I Q JOEXSTING DOUBLE WALL 1 /2' RIGID CONDUZL� oF <br /> SUMP CL <br /> Ski <br /> U� STOPLAGE W <br /> ANOVER FILL ALARM <br /> EXISnNa <br /> EISG FILL SUMP ( PO GAJO <br /> 1234 0 <br /> 58I Qw <br /> D=NG ~ LL- <br /> J <br /> INTERSTITIAL MON <br /> ITOR ( P•) I II INSPENSERS O <br /> N <br /> ISLAND ) <br /> z0 <br /> NC TANO M <br /> O LO <br /> dMA E SLAB <br /> XM > Z <br /> I I I <br /> I�` I ® ❑ I E(EIYSPT.)ING II Io II mWW <br /> � <br /> CANM COWMN 42' MANHOLE p ♦— O NO PHASE CAP <br /> RUCP PHASE1 L <br /> EXISTNG IC. ADAPTER <br /> ROTATABLE Z <br /> UNIT �) FILL ROTATABLE O V d <br /> 1 4OLEDGE SWITCH )INE• <br /> 6 Q <br /> GENEENE <br /> d <br /> � <br /> FILL 5 GALLON 4 PHASE 15 2 OVERFILL ALARM ICES. Ww 4d <br /> BUCKET (Y/ GALLON immon <br /> r� <br /> I.D. SIGN GRAIN VALVE) BUCKET Z (— <br /> L70STMp �, ,, UNE BRAN vALVTa 3_,5, . . �. i i N <br /> ASSEMBLY I Por afar � i' . i' i �. �' LLJ <br /> SIDEWALK O 6 FACE SEA. <br /> ADAPTER ♦ W <br /> �S • A'PRLVACH FACE SEAL. EXTRACTOR f <br /> FITTING 9 n <br /> 5 (BEYDNO) arAi 00 <br /> RF 44"xl BACK .. . . ... 40 <br /> Sv, <br /> Q PIPE GAP VI MCO <br /> 1 <br /> BALL FLOAT EXTRACTOR _ <br /> Z ONE °nnd <br /> YOSEMITE BLVD. AAL LOCATED a <br /> CAPACITY <br /> INSTALLATION NOTES : ' 95X 1 <br /> °� n � s� ALARIM W �iZ��� <br /> BEFORE START OF SAW CUMNO, REMEASURE TO CONFIRM THAT EXISTING MANHOLE FRAME ISNOT COMPATIBLE O 90% LOGTED AT 98R Q rr3K1 < Z t43 <br /> WITH NEW MANHOLE LA, IF UO IS COMPATIBLFF DO NOT CUT UNTIL FIELD ENGINEER HAS CONFIRMED A NEED TO 18 CAPACITY gro " S <br /> REPLACE MANHOLE FRAME. 10' 0 IW 20• JO 1s w c�ga l'a <br /> Q CONTRACTOR TD SAW Cur a• X a• MINIMUM SECTORS OF EX,STING TANK SUB AT EACH MANWAY AS SHOWN. L �� W <br /> ® CONTACTOR 10 REMOVE IX6TING FILL SPLL BIIA(ETS. REAFOYE E%ISITNG DROP TUBE FLAPPER VALVE OF ANY), GRAPHIC SCALE <br /> AND ANY NON-EVR 641 FLOATS. <br /> (I) CONTRACTOR TO INSTALL NEW EVR SWdX RISER ADWIERS AND THREADED NIPPLES AT EACH VAPOR k FILL RISER. AS BUILT NOTE16 <br /> THIS SITE PLAN Has BEEN PREPARED WITHOUT <br /> Q CONTRACTOR TO INSTALL. NEW 5 GALLON SPILL CONTAINMENT BUCKETS AND MANHOLE W/ FRAME AT EACH TAW BENEFIT OF TIRE REPORT, SURVEY, OR LEGAL ooneulfan, )ob# <br /> FILL EVR VR-102—B COMPLIANT. INSTALL NEW WATER SHIELD AND RISER SUPPORTS AT EACH FILL SUMP. RIP ON,CONDITIONS AS MEASUREFLECTS EXISTING SITE STAGE I VAPOR RECOVERY & 3 TYPICAL TURBINE ELEVATION K,T.a. Osseo <br /> Qs coNrRAcroR TO WALL NEW FILL DROP TUBE AND 13LLL FLOATS AT EACH TAvR <br /> iK. ENt -102-6 COMPLIANT. Rm r Lasa <br /> COMPLIANT. FILL DETAIL (GASOLINE� �� <br /> © daN <br /> CONTRACTOR TO INSTALL NEW RISER COMPONENTS AT E#STING TANK GAUGE RISERS. FIELD VERIFY EXACT RISER N0. - 9p WEST C(IAST PRDOlIC1S. LLC MASTER REVSIOEg Taalgrby <br /> ' °�'"" EVR VR-CD2-B DDMPLIAKT. Underground Service Alert „ -07-02 AL <br /> 7 �0 NTRACTOR TO RMA L NEW P1, VACUUM VENT VALVE AT EACH VENT RISER. N0. DATE REVISIONS BY PROJECT RELEASE <br /> O (CONTRACTOR TO FIELD VERIFY Ql1AFfT EVR VR-102-8 COMPLIANT. SEE ITIEM 013 ON EQUIPMENT LIST, IM 900AENT NO DE IEOF MVION IE1M FIEA7w TO RED FEOOL D1/07/ REV, EQUP. CHANGE PER BP AL Fllwwtne <br /> O CONTRACTOR 7D PATCH ALL REMOVED CONCRETE TO MATCH E70SRNG. 0011: TOLL FREE AISOMQU Nom LaEln HAIL ml FLIMHM N DOFDFICE FOR PERMIT 11 -07-03 F(p - <br /> 1 0 PRWOE uE OF ADnM= PMOL E1. W NK IE1s0F Euu DE s1,1 Ha, <br /> l 11 <br /> FUELING B UPLIMM Dente osnaom oR WDE AWAKE 10 <br /> QNor u D OR Tum M Arc DOOIT *KMOE" DOM a DMOKY BID 06020 <br /> 10 INSTALL NEW V®Qt-ROOT WEFa•TLL AdAWI W/ ACgKOW1EOG11ENT 51NTO1 AND NEW AUTOMATIC TANK 227or1C00 <br /> POSITIONS N RWCAWWW 9Y O 111144 NO MOd100 HD IIAOPEAR <br /> OAUALL E NQT IXR7N0. L V � �b�o Ere Doa�AM 10 THE Eh"t name <br /> H41. M VWFIUE IEIEDF E OmED 10 NAE AGfEiD 10 THE <br /> NOZZLES 13 <br /> TWO WORKING TK 1 - 1 <br /> DAYS BEFORE YOU DIG �_ T <br />