My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 12:14:14 PM
Creation date
5/1/2020 9:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2251168 <br /> by <br /> iTanknology <br /> July 18,2007 <br /> Station Number 06020 <br /> 1711 E Yosemite Manteca,CA 95336-5053 <br /> VIA CERTIFIED MAILO.7155 5474 4100 4604 0801 <br /> To Whom It May Concern: <br /> Tanknology will be at your location on the date and time listed below to conduct a Facility <br /> Inspection. Testing is required by the San Joaquin County E-AP.Health and it has been <br /> scheduled with an agency representative. <br /> Test Dale: July 30,2007 <br /> Test Time: 1,00P.M. <br /> Monitor,Leak Detector,Spill Bucket,E-Stop,Shear,Site Survey: <br /> [Ibis time has been reserved for your station and cancellations will result in a chargeback. IN <br /> order for the test to be completed on the scheduled date,NO fuel deliveries should be made or <br /> scheduled during test time. It is important that a sufficient number of replacement nozzles are at <br /> that station prior to the scheduled test date.In the event spare nozzles are not availablc and any <br /> one nozzle fails the test,Tanknology will need to make the hardware replacement and you will <br /> be charged for the repair.] <br /> The station will not be able to pump fuel for 3 to 6 hours,while we conduct the compliance <br /> testing. <br /> if you have any questions,please call your BP Environmental Compliance Specialist Ruth Ila at <br /> 503-524-6191. <br /> Sincerely, <br /> Tanknology <br /> Tanknology Inc. 8501 N.MoPac Expressway, Suite 400,Austin,Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.