My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARTHUR
>
23534
>
2800 - Aboveground Petroleum Storage Program
>
PR0524264
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 9:48:20 AM
Creation date
5/1/2020 10:11:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0524264
PE
2832
FACILITY_ID
FA0006141
FACILITY_NAME
A L POWELL TRUCKING
STREET_NUMBER
23534
Direction
E
STREET_NAME
ARTHUR
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
22903010
CURRENT_STATUS
01
SITE_LOCATION
23534 E ARTHUR RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Certification Statement (4112.6(a)(1)) <br /> Professional Engineer Certification (40 CFR 112.3(d)) <br /> CERTIFICATION <br /> I hereby certify that we have examined the facility and being familiar with the provisions of 40 <br /> CFR 112, attest that this SPCC Plan has been prepared in accordance with good engineering practices <br /> This facility has greater than 10,000 gallons storage capacity and is not likely to cause substantial harm <br /> to a navigable waterway. This Professional Engineer certifies herein that he is familiar with the SPCC <br /> rule, has caused his representative to have visited and examined this facility, and that this SPCC Plan <br /> has been prepared in accordance with accepted and sound industry practices and standards; <br /> procedures for required inspections and testing have been established. The Plan is being fully <br /> implemented; the facility meets the qualifications criteria set forth under Section 112.3(g) of 40 CFR; <br /> the Plan does not include any environmental equivalence measures as described in Section 112.7(a)(2) <br /> or determinations of impracticability under Section 112.7(d) and the Plan and the individuals <br /> responsible for implementing the Plan have the full approval or management and the facility <br /> owner/operator has committed the necessary resources to fully implement the Plan. This PE certifies <br /> that the AST integrity test protocols as outlined in Appendix F herein, are, in compliance with Section <br /> 112.3(d) which specifically states that the PE certification of a Plan attests that "procedures for required <br /> inspections and testing have been established, and that the test and inspection methods and protocols <br /> are of good engineering practice, based on the professional judgment of the PE certifying this SPCC <br /> Plan in consideration of industry standards. In addition, recommended practices, safety considerations, <br /> and requirements of other federal, state, or local regulations have been considered in the development <br /> and PE certification of the SPCC Plan.. <br /> I hereby certify that the above information on Certification is true and accurate to the best of my <br /> ability, and that all items under this SPCC Plan have been or will be fully implemented. <br /> eR4FESS/pN <br /> ANc is �y�� —,-pw-Lzz- <br /> < <br /> � Panted Name Of Registered P.E. <br /> C63087 z <br /> * <br /> P. 06 p-22 <br /> Signature of Registered P.E. <br /> (Seal) i <br /> Dated/x/2020 Registration Number ('�j(�LV <br /> 7 State License <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to <br /> prepare and fully implement this SPCC Plan in accordance with the requirements of 40 CFR part <br /> 112. This Plan is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment, and other devices as prescribed in this Plan. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.