Laserfiche WebLink
VI. REMOVAL OPERATIONS <br /> A. Equipment. The following equipment shall be provided at the Site as <br /> needed for clean-up: <br /> (1) 930 Catepillar frontend loader equipped with a four-in-one bucket <br /> (1) Backhoe <br /> Removal/transportation trailers as needed <br /> Hand tools as needed (i.e., shovels and rakes) <br /> Brass tools for use around metal containers with flammable or unknown <br /> chemical contents <br /> Personal protective equipment (PPE) [Described above] <br /> Spill absorbing material <br /> Personnel: <br /> (1) Supervisor of operatio provided by contractor. Pousematt <br /> the following qualifications: 40 hours of o -site instruction in Kazaral training, <br /> CPR certified, past experience in clean-up and removal of hazardous materials (see <br /> Hazardous Substances Removal and Remedial Actions Certificate attached to Schedule"Y). <br /> This "Supervisor"shall be supplied by the contractor,the entity hired by the <br /> Owner/Operator to complete the clean-up. [See Schedule #3 attached hereto.] <br /> (2) Hazardous material handlers provided by Owner/Operator. These <br /> personnel will have a minimum of 40 hours of off-site instruction in the handling of <br /> hazardous materials as required by 29 CFR § 1910.120. <br /> (3) Laborers - These personnel will have no special training in handling <br /> hazardous waste materj�als. a,& 4 <br /> , ., Z/1 - <br /> (4) Frontend loader/operator. - <br /> (5) Backhoe operator. <br /> 1 <br /> (6) Operators of tractors to transport removal trailers. <br /> 11 <br />