Laserfiche WebLink
Yes No Comment <br /> Generation Points ("Satellite Accumulation") <br /> (Reference 25123.3 and 66262.34(e) ) <br /> Has the generator acx LILlated HW at or near the <br /> point of initial generation without meeting <br /> storage deadlines provided they accumulate no more 0 <br /> than X55 gallons of H� or one quart of acutely or ✓ , j <br /> extremely HW, and: [66262.34(e) (1)-] <br /> (A) The waste is acc.Fadated in containers at or <br /> near the area whereenerated and which is under / <br /> the control of the c erator of the process? v <br /> (B) The waste is held on-site for no more than <br /> one year, nor more than 90 days from reaching V/ <br /> applicable quantity limits? <br /> (C) The initial datelof accumulation is clearly <br /> marked and visible f r inspection on each <br /> container? _ <br /> (D) The HW is carat le with the container used / <br /> for accumulation and the container is kept closed <br /> except when necesto add or remove waste? <br /> (E) The generator lies with <br /> 66262.34(e) (2) , (3) (f) (3)? <br /> * Note: If the genera or has determined that not all wastestreams generated by a single <br /> process or group of processes in the same physical area are conpatible the <br /> apply a separate 55 al. or 1 generator may <br /> g qt. limit to each group of compatible wastestreams, <br /> (Reference 66262.34(e) (2) (A) ) <br /> Also, if the generator determines that using only one 55 gal. or 1 qt. container to <br /> initially accumulate specific compatible wastestreams is not practical or safe, the <br /> generator may use a separate container for those specific compatible wastestreams <br /> (although this dete tion is subject to review and approval by the Department at any <br /> time) . (Reference 662 2.34(e) (2) (b) ) <br /> Once the generator has accumulated an amount of HW <br /> equal to any applicabl quantity limitation listed <br /> in 66262.34(e) (1) , has the generator, with respect <br /> to that waste, within ee days, labelled the <br /> container with the da the quantity limit was <br /> reached and complied w th 66262.34(a)? <br /> [66262.34(e) (3) ] <br /> 90 Day Accumulation <br /> (Section 66262.34) <br /> If she generator does of have a permit or interim <br /> status (as a TSD facility) have they accumulated / n <br /> HW on-site for lessthn 90 days (except as / L, V <br /> VA <br /> provided under 66262.341(d) )? [66262.34(a) ] <br /> ,✓✓✓ II�TT lll///��� �� ��// <br /> NOM: For generators o not more than 100 kg/mo. of HW nor 1 kg/mo. of acute or extremely <br /> HW, the 90 day periodins on the date the generator has accumulated 100 kg (or 1 kg) . <br /> (Reference 66262.34(b) 25123.3(b) ) <br /> Revised 7/15/91 Page 4 <br />