Laserfiche WebLink
Yes NL) Comment <br /> 9 DayAccImTUlation in Tanks (cont. <br /> (Section 66262.34) <br /> Are sources of impres current inspected at <br /> least every other mon to ensure proper <br /> functioning? (66265.1195(b) (2) ] <br /> Leaks ills unfit- r-use tanks: <br /> If a tank system has d a leak or spill, or is <br /> unfit for use, was it iately removed from <br /> service, and did the g erator:? [66265.196-] <br /> (a) Comply with appli ble requirements of <br /> section 66265.56? ( page 24) <br /> (b) Immediately stop e flow of HW into the — <br /> system, and inspect t determine the cause of <br /> the release? <br /> If the release was f a tank system, did the <br /> generator (if possible) remove enough waste to <br /> prevent further rel and allow inspection arra <br /> repair? [66265.196(c) 1) ] <br /> If the release was to secondary containment <br /> system, were all relea materials removed <br /> within 24 hours (or in timely manner)? <br /> [66265.196(c) (2) ] <br /> If the release was toe environment, did the <br /> generator immediately V.sually inspect the <br /> release, and: [66265.1 6(d)-] <br /> (1) Contain it to prevt further migration <br /> to soils or surface wa ers? <br /> (2) Remove and properl dispose of any visible <br /> contamination of the s it or surface water? <br /> Was the leak or spill o; HW less than or equal <br /> to one pound and immedi 'tely contained and <br /> cleaned up? [66265.196 e) (2) ] <br /> If not, was the spill o leak reported to the <br /> Department within 24 h ? [66265.196(e) (1) ] <br /> If the release was to environment, was a <br /> full report (see 66265.1 6(e) (3) ) submitted to <br /> the Departr nt within 30Idays of detection? <br /> [66265.196(e) (3) ] <br /> Revised 7/15/91 Wage 9 <br />