Laserfiche WebLink
Yes No Comment <br /> �0 Day Acclumilation in Tanks (cont ) <br /> (Section 66262.34) <br /> Is the secondary containment system (if required, <br /> see table on page 14)',, at a minimum. <br /> [66265,193(c)-] <br /> (1) Constructed Of Or lined with materials <br /> that are compatibleith the waste(s) to be <br /> placed in the tank stem, and have sufficient <br /> strength to prevent ailure? <br /> (2) Placed on a fow-,dation or base capable of <br /> Providing support to the secondary containment <br /> system and resistance to pressure gradients? <br /> (3) Provided with a lead detection system <br /> designed and Operated to detect the failure of <br /> either the primary ar�d secondary containment, <br /> or any release with" 24 hrs or ASAP? <br /> (4) Sloped, or designed or operated, or to <br /> remove liquids? <br /> If there is a release, has material and <br /> accumulated precipitation removed within <br /> 24 hrs or ASAP?, and* I [66265.193(c) (4)-] <br /> (A) If a HW, managedccorrling to all <br /> applicable requiremen of Chs. 2 - 15? _ <br /> (B) If dischargedqA <br /> gh point source to US <br /> waters, are sectio1, 304, and 402 of the <br /> Federal Clean Wate (Cv1A) compliedwith? <br /> (C) If discharged PO W, is section <br /> 307 of the CWA comwith? <br /> (D) If released to th environment, have <br /> reporting requirement of 40 CFR Part 302 <br /> complied with? <br /> Does secondary conta° t include one or more <br /> of the following; [662., 5.193(d)-] <br /> (1) An external liner?I, or <br /> (2) A vault?, or <br /> (3) A double-walled ?, or <br /> (4) An equivalent devi approved by the <br /> Department? <br /> Revised 7/15/91 Page 13 <br />