Laserfiche WebLink
Yes No Comment <br /> 9 Day Accumulation in Tanks (cont. ) <br /> (Section 66262.34) <br /> If the source of any leak to the environment was <br /> from a component or tank without secondary <br /> containment, and was }below ground or not readily <br /> accessible for visual inspection, was the tank or <br /> entire component prov ded with secondary <br /> containment (per 6626 .193) before returning to <br /> service? [66265.196( ) (4) ] <br /> If the source of any eak to the environment was <br /> from an aboveground v scally accessible component, <br /> was it repaired and rtified before returning to <br /> service? (66265.196( ) (4) ] <br /> If the generator has extensively repaired a tank <br /> system that leaked, was the repaired system <br /> certified in accordance with 66270.11(d) before <br /> returning to service? i [66265.196(g) ] <br /> Tank closure and post-closure care- <br /> At closure, did the geperator remove or <br /> decontaminate all waste residues, contaminated <br /> containment systemnents, structures, soil, <br /> and equipment? [66265 197(a) ] <br /> If the generator demon�;trated that all <br /> contaminated soils cannot be removed or <br /> decontaminated, did they close the tank and <br /> perform post-closure care as a landfill <br /> (per 66265.310) and t all the requirements <br /> for landfills as speci ied in Arts. 7 and 8 of <br /> Ch. 15? (66265.197(b) <br /> The Manifest <br /> (Chapter 12, Article 2) <br /> Does the generators [(6262.20-] <br /> (a) Prepare a couple manifest according to <br /> the instructions (see Ch. 12 Appendix) before <br /> transporting HW off-s' e? _ <br /> (b) Designate on the ifest a facility which <br /> is permitted to handl the HW? _ <br /> (d) Designate another acility or instruct <br /> transporter to return ste if delivery to <br /> designated facility is prevented? <br /> Revised 7/15/91 Page 17 <br />