My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. <br />FEATHER RIVER CANYON <br />Flow Control Structures: PG&E facilities may become an integral part of <br />limiting the dispersion of a spill and subsequent environmental impact. UPRR <br />and PG&E have a common understanding that in certain events, such as spills <br />into the river, flow through dams may be temporarily curtailed for containment <br />purposes. Additionally, PG&E generally stores supplies of sorbent boom and <br />other materials which may be used by UPRR under condition of in-kind <br />replacement. In the event of a spill into the river, PG&E will be contacted for <br />avo owlate action. <br />D. Eauinment Location and Inventories: <br />Location <br />Supplies <br />Belden Powerhouse <br />................................... <br />Sorbent material <br />Rock Cree <br />.......................................... <br />Sorbent boom <br />Rogers Fla <br />(PG&E) ...................... <br />Major supply of sorbent materials <br />Rogers Fla <br />(UPRR) ..................... <br />Future location spill control trailers <br />Rock Creeb <br />Powerhouse ................................. <br />Sorbent boom <br />Bucks Store <br />Intake/Dam................................ <br />Sorbent boom <br />Bucks Creel'Powerhouse <br />.............................. <br />Sorbent materials <br />Cresta Intake/Dam <br />...................................... <br />Sorbent boom <br />Cresta Pow <br />rhouse ........................... <br />Sorbent boom and materials <br />Poe Intake <br />am ....................................... <br />Sorbent boom <br />Poe Powerf <br />ouse ............................. <br />Sorbent boom and materials <br />Chico, CA <br />............................. <br />AC Industrial's supply warehouse <br />Personnel <br />oles: <br />Service Unit <br />11 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.