Laserfiche WebLink
FORM IC <br />l page 2 of <br />Sec. VI - Generator St <br />tus EPA ID NO. <br />A. 1991 RCRA generator status <br />B. Reason for not generating <br />Instruction page 7 <br />Page 9 <br />(CHECK ONE BOX BELOW) <br />(CHECK ALL THAT APPLY) <br />1 LOG <br />❑ 1 Never generated <br />❑ 4 Only non -hazardous waste <br />❑ 2 SOG (SKIP TO SEC. VII) <br />❑ 2 Out of busyness <br />❑ 5 Periodic or occasional generator <br />❑ 3 CESOG <br />❑ 3 Only excluded or delisted <br />❑ 6 Waste minimization activity <br />❑ 4 Non generator (CONT( UE TO BOX B) <br />waste <br />❑ 7 Other (SPECIFY COMMENTS IN BOX BELOW) <br />Sec. VII - On -Site Waste <br />anagernent Status <br />A. RCRA permitted or interim status storage <br />B. RCRA permitted or interim status <br />C. RCRA-exempt treatment, disposal, or recycling <br />Instruction page 10 <br />treatment, disposal, or recycling <br />Page 11 <br />Page 10 <br />U <br />LZ <br />�I <br />Sec. VIII - Waste rtiiiiriiiirita la i. Acafvt during ig 1 � or 1991 <br />A. Did this site begin or expand a 1ts2M= <br />B. Did this site begin or expand a <br />C. Did this site systematically investigate opportunities <br />reduction activity during 1990 r 19917 <br />racyrling activity during 1990 or 1991 <br />for source reduction or regycl�no during 1990 or 19917 <br />Instruction page 11 <br />Page 12 <br />Page 12 <br />1 Yes <br />El -1 Yes <br />-M 1 Yes <br />❑ 2 No <br />❑ 2 No <br />❑ 2 No <br />D. Did any of the factors listed bel pw delay or limit this site's ability to initiate new or additional source reduction activities in 1990 or 19917 <br />Page 12 <br />(CHECK YES OR NO FOR EACH ITEM) <br />Yn;L L <br />❑ 1 0 2 a. Insufficient opital to install new source reduction equipment or implement <br />new source reduction practices <br />El ® 2 b. Lack of tech 'til information on source reduction techniques applicable to the specific production processes <br />❑ 1 Gj 2 C. Source red ion is not economically feasible: cost savings In waste management or production will not recover <br />the capital in estment <br />Ell ® 2 d. Concern that roduct quality may decline as a result of source reduction <br />❑ 1 © 2 e. Technical limitations of the production processes <br />❑ 1 ❑ 2 f. Permitting ens <br />El E3 2 g. Source redn previously implemented - additional reduction does not appear to be technically feasible <br />❑ 1 © 2 h. Source redn previously implemented - additional reduction does not appear to be economically feasible <br />tin <br />El ® 2 i. Source red previously implemented - additional reduction does not appear to be feasible due to permitting requirements <br />El1 3 2 j. Other (SPECOMMENTS IN BOX BELOW) <br />E. Did any of the factors listed below delay or limit this site's ability to initiate new or additional on-site or off-site (ems activities during 1990 or 19917 <br />Page 12 I <br />(CHECK YES OR NO FOR EACI+f ITEM) <br />YAL 1Q Yna t& <br />C3 ❑, 2 a. Insufficient ital to Install new recycling equipment 01 ®' 2 <br />h. Technical limitations of productlon processes inhibit <br />or implement ow recycling practice <br />on-site recycling <br />❑1 2 b. Lack of techn' Information on recycling techniques ❑1 .9 2 <br />i. Permitting burdens inhibit recycling <br />applicable to is site's specific production processes ❑1 S 2 <br />j. Lack of permitted off-site recycling facilities <br />Ell 3,2 C. Recycling is n economically feasible: cost savings in 01 ET 2 <br />k. Unable to identify a market for recyclable materials <br />waste manag ment or production will not recover the ❑l [R 2 <br />I. Recycling previously implemented - additional <br />capita km ent <br />recycling does not appear to be technically feasible <br />❑1 132 d. Concern that roduct quality may decline as a result ❑1 ® 2 <br />m. Recycling previously implemented - addWoral <br />of recycling <br />recycling does not appear to be soonorn"ly, feasible <br />❑l [Q 2 e. Requirements to manifest wastes inhibit shipments off 1:11 ® 2 <br />n. Recycling previously Implemented - addhlonal <br />alts for recycli <br />recycling does not appear to be feasible due to <br />Ell 132 f. Financial Nabi provisions inhibit shipments off site for <br />permitting requirements <br />recycling ❑1 2 <br />o. Other (SPECIFY COMMENTS IN BOX BELOW) <br />C31® 2 g. Technical Nm tions of production processes inhibit <br />shipments off to for recycling <br />Conwnertts: <br />l page 2 of <br />