My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PU LiC HEALTH SE VICES <br />SAN JOAQUIN COUNTY Q <br />JOGI KHANNA M.D., M.P.H. <br />Health Officer <br />cq�iFo'µi'�v <br />P.O. B x 2009. (1601 East Hazelton Avenue) • Stockton, California 95201 <br />(209)468-3400 <br />4-24-90 <br />Central Valley Regional Water Quality Control Board % <br />Antonia Vorster (co <br />3443 Routier Road <br />Sacramento, CA 95 27-3098 <br />RE: Union Pacific ailroad Pipeline Closure <br />833 E. Eight S reet <br />Stockton, CA <br />This letter confirms our conversation of September 27, 1989, and January 17, 1990, regarding <br />the closure of a Uni n Pacific Railroad (UPRR) pipeline spanning 4 1/2miles from the Port <br />of Stockton to the .P.R.R. at 833 E. Eighth St., Stockton. <br />It was determined th it Public Health Services, Environmental Health Division (PHS-EHD), <br />would assume the le d authority for the closure of the pipeline with the concurrence of the <br />CVRWQCB. <br />As discussed, Union Pacific Railroad would have two options for the proposed pipeline <br />abandonment and c$sure: <br />1. Remove theipeline. <br />-or- <br />2. Fill the line i place with a cement slurry. <br />Additionally, the pr osed closure would require U.P.P.R to submit a workplan consisting <br />of the following: <br />1. A soil/vapor urvey encompassing the 4 1/2mile stretch of pipeline. <br />2. After comple ion of the soil vapor survey, soil and/orgroundwater sampling is to be <br />performed in suspected or documented leak areas. <br />3. Upon conclu ion of sampling program and PHS-EHD/CVRWQCB evaluation and <br />approval, the pipeline may be filled with cement slurry or removed. <br />4. All workpla are to be approved by Public Health Services, Environmental Health <br />Division, with CVRWQCB concurrence. A PHS-EHD permit will be required for the <br />soil/vapor su ey. UPRR will be required to submit copies of all survey and/or <br />sampling res Its to both agencies referenced above. <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.