Laserfiche WebLink
ANTEA GROUP <br />Spill Prevention, Control, and Countermeasure Plan <br />UPRR -Stockton, CA Yard <br />February 2016 <br />Table A - SPCC Cross -Reference <br />Provision <br />Plan 3ection <br />Page/Appendices <br />112.3 d <br />Profe sional Engineer Certification <br />v <br />112.3 e <br />Local on of SPCC Plan <br />vii <br />112.5 <br />1.3 -'Ian Review <br />Table 1-1 <br />112.7 <br />Mana ement Approval <br />vi <br />112.7 <br />Table A - SPCC Cross -Reference <br />Table A <br />112.7(a)(3) <br />4.1 - 1hysical Layout <br />8 <br />112.7(a)(3) <br />Appendix B: Site Plan and Drainage Diagram <br />Appendix B <br />112.7(a)(4) <br />4.3 - Countermeasures <br />14 <br />11 2.7 a 5 <br />5.0 - ill Response <br />16 <br />11 2.7 b <br />6.0 - llotential for Equipment Failure <br />19 <br />1 12.7 c <br />7.1 - $econdary Containment and Diversionary Structures <br />22 <br />11 2.7 d <br />7.2 - acticability of Containment <br />22 <br />112.7(e) <br />8.0 - I s ections, Tests, and Records <br />23 <br />112.7(f) <br />9.0 - P rsonnel, Training and Discharge Prevention Procedures <br />25 <br />112.7(g) <br />10.0 - ;ecurity <br />26 <br />11 2.7(h) <br />11.0 - ank Truck Loading/Unloading <br />28 <br />112.7(i) <br />12.0 - Tittle Fracture Evaluation <br />29 <br />112.70) <br />13.0 - onformance with State and Other Requirements <br />30 <br />112.8(b) <br />14.0 - tacility Drainage <br />32 <br />112.8(c)(1) <br />15.1 - Materials and Construction <br />34 <br />112.8(c)(2) <br />4.2.1 - Oil Storage Tanks and Other Containers <br />9 <br />112.8(c)(2) <br />4.2.3 - 3ulk Liquid Transfer Facilities <br />12 <br />112.8(c)(3) <br />15.3 - iked Areas Drainage <br />35 <br />112.8(c)(6) <br />15.6 - ank Testing and Inspections <br />35 <br />11 2.8(c) 6 <br />Appenjix I - Facility inspection Checklists <br />Appendix I <br />I I2.8(c)(8) <br />15.8 - Tank Overfill Protection Practices and Standards <br />37 <br />112.8(c)(10) <br />15.10 - Visible Oil Leaks <br />38 <br />112.8(c)(11) <br />15.11 -Mobile or Portable Tanks <br />38 <br />112.8(d) <br />16.0 - f acility Transfer Operations, Pumping & Facility Processes <br />39 <br />112.20(e) <br />Certification of Substantial Harm Determination <br />viii <br />R E 0, E €V E ED,,) <br />FEB Y 12016 <br />ENVIRONMENTAL HEALTH <br />bEPHRTMENT <br />iv <br />Antea Group Project No. UP0307-1 <br />