Laserfiche WebLink
Pumps are on the flow will be pumped through the <br />Clarifier until it reached retention capacity. The <br />excess will be pumped to the 88,000 gallon surge <br />retention tank. <br />corrosion Paint <br />Prote tion <br />Descri tion: <br />Seco Bary Curbing <br />Contain ent <br />De ion: <br />recon ary Concrete <br />Contain ent <br />Mate ial: <br />rrecipitaion <br />Drainage Syst <br />None <br />m: <br />Runoff Inspection: <br />Visual <br />Dispensing Fac�lity <br />N/A <br />Inspection Freque• <br />Comm nt: <br />Formerly reffered to as AST -9. <br />