My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Report <br />Location: CA, Stockton <br />List I Edit ( Delete <br />I <br />Namle: ACE -1 Abbr: <br />Facility: VM -1 <br />Locomotive <br />Repair Shop <br />Tank N6r: <br />Figure Nbr: 2A <br />Description: <br />This is a 2100 gallon welded steel tank used for <br />Product Detecte: <br />visual <br />lubricating oil by the leasee ACE. It is located <br />visual <br />Test Method: <br />within the Diesel Shop, where the engine pits <br />Failure Probability: <br />low <br />connected to the industrial sewer provide <br />east into pits <br />Sensitive <br />secondary containment. <br />Access Rou <br />a <br />Enter the Yard at East 8th Street. Head north to <br />Description: <br />the Diesel shop. This tank is located inside the <br />diesel shop against the west wall. <br />Material:Welded <br />Steel Product: Lube Oil <br />Dimension: <br />6'1" long x Volume: 2100 <br />3'10" dia <br />Year Installed: <br />1998 Position: horizontal <br />Base Suppo : <br />concerete Annual Usage: 22000 <br />Longitud : <br />Latitude: <br />Op90 Thrs In : <br />No Port Tank Ind: No <br />Period Flood In : <br />No <br />Removal Date: <br />Proposed <br />Removal Date: <br />Inventory Method: <br />receipts <br />Over Fill Spill: <br />guage <br />Product Detecte: <br />visual <br />Integrity <br />visual <br />Test Method: <br />per Core <br />Failure Probability: <br />low <br />Flow Direction: <br />east into pits <br />Internal <br />no <br />Heating Coil: <br />Spill Avoid System: <br />visual <br />Response Time: <br />2 hours <br />Test Frequency: <br />per Core <br />Plan <br />Failure Type: <br />rupture <br />Sensitive <br />No <br />Environment: <br />Discharge 2100 gpm Ultimate Discharge 2,100 <br />Flow Rate: Containment Volume: <br />Discharge Scenari Tank rupture would release entire tank into pits. <br />Descriptio : Pits are connected to industrail sewer. Oil would be <br />skimmed off wastewater in clarifier. <br />
The URL can be used to link to this page
Your browser does not support the video tag.