Laserfiche WebLink
Union Pacific Railroad <br />Containment Drip pns and service pits are used to contain oil spills <br />Structures during Lgine servicing. Empty oil tanks (AST -11 and 12) <br />Desc: have a concrete containment dike around them. There is <br />no draigage system within the dike. <br />Security Thearja is well lighted and manned by Railroad <br />Systems employes nearly continuously. <br />Desc: <br />Escape <br />Route Desc: <br />Comment: <br />http://home. www.uprr. co*depts/EnvMgmt/C eps/cfm/Reports/Info _Plan. cfm 10/29/03 <br />