My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Union Pacific Railroad <br />Tank Report <br />Location: CA, Stockton <br />Name: TNKO-0294 Abbr: TNKO- <br />0294 <br />Facility: All <br />Tank N r: TNKO-0294 Figure Nbr: 2A <br />Description: This is a 7000 gallon poly tank used to <br />accumulate sludge from the WWTP operations. <br />Access Roue <br />Descriptio <br />: <br />Materi,: <br />Polyethylene Product: Sludge <br />Dimensio <br />Volume: 7000 <br />Year Installed: <br />Position: Vertical <br />Base Support: <br />Concrete Annual Usage: 2000 <br />Longitude: <br />Latitude: <br />Op90 Thrs Ind: <br />No Port Tank Ind: No <br />Period Flood Ind: <br />No <br />Removal Date: <br />Proposed <br />Inventory Method: <br />Removal Date: <br />receipts Internal no <br />Heating Coil: <br />Over Fill Spill: <br />Visual Spill Avoid System: Visual <br />Product Detected: <br />None Response Time: Prompt <br />Integri y <br />Visual Test Frequency: Passive <br />Test Method: <br />Failure Probabilit : <br />Low Failure Type: Puncture <br />Flow Directi 3 : <br />east to Sensitive No <br />WWTP sump Environment: <br />Dischare <br />50 GPM Ultimate Discharge 10,000 <br />Flow Rate: <br />Containment Volume: <br />Discharge Scenario <br />Tank punctured by metal object. <br />Description: <br />Discharge Detection <br />Sludge released from this tank will be deflected <br />System Description: <br />by the concrete curb to the WWTP sump. The <br />entire contents of the sludge tank will be easily <br />contained within the sump and concrete <br />surrounding area. <br />Corrosio <br />Protectio <br />Descriptio <br />Secondary <br />Curbing <br />Containment <br />Desig <br />Secondar <br />Concrete <br />Containme t <br />Materia <br />Precipitatio <br />Drainage Syste <br />Runoff Inspection: <br />http:Hhome.www.uprr.com/depts/EnvMgmt/Ceps/cfm/Reports/Info Plan.cfm 11/18/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.