My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Union Pacific Railroad <br />Tank Report <br />Location: CA, Sto�kton <br />Name <br />TNKO-0298 <br />Abbr: TNKO-0298 <br />Facility <br />All <br />Heating Coil: <br />Tank Nbr <br />TNKO-0298 <br />Figure Nbr: 213 <br />Description <br />1,000 gallon, steel waste oil tank <br />Visual Test Frequency: bi-Monthly <br />Test Method <br />Access Route <br />California Avenue <br />south from Charter Way(SR4) to <br />Description <br />Heinz Road. Facility is at the end of the road. <br />Material <br />Welded Steel <br />Product: Skimmed Oil <br />Dimension <br />4' dia by 12' <br />Volume: 1000 <br />Year Installed <br />1995 <br />Position: Horiz. <br />Base Support <br />Concrete <br />Annual Usage: 500 <br />Longitude <br />System Description <br />Latitude: <br />Op90 Thrs Ind <br />No <br />Port Tank Ind: No <br />Period Flood Ind <br />No <br />Removal Date <br />dike <br />Proposed 12/31/1999 <br />11/18/03 <br />Removal Date: <br />Inventory Method <br />receipts Internal None <br />Heating Coil: <br />Over Fill Spill <br />Visual Spill Avoid System: Visual <br />Product Detected <br />Visual Response Time: Prompt <br />Integri <br />Visual Test Frequency: bi-Monthly <br />Test Method <br />Failure Probability <br />Very Low Failure Type: Corrosion <br />Flow Direction <br />Contained in Sensitive No <br />dike Environment: <br />Discharg <br />contained Ultimate Discharge 1,000 <br />Flow Rate <br />Containment Volume: <br />Discharge Scenario <br />Tank rupture or overfill would cycle though the <br />Description; <br />system within the dike until cleanup or corrective <br />action takes place. <br />Discharge Detectio <br />System Description <br />Corrosior <br />paint <br />Protectio <br />Description: <br />Secondary <br />dike <br />Containmen <br />Design <br />Secondar <br />composite <br />Containme I <br />Material <br />Precipitatio <br />recycles through separator <br />Drainage System: <br />Runoff Inspection <br />n/a <br />Dispensing Facili <br />Inspection Frequency <br />Comment <br />Formerly known as AST -13. <br />http://home. www.uprr. corgi/depts/EnvMgmt/Ceps/cfm/Reports/tnfo_Pl an.cfm <br />11/18/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.