Laserfiche WebLink
Union Pacific Railroad <br />Tank Report <br />Location: CA, Sto kton <br />Name AST -12 <br />Facility All <br />Abbr: AST -12 <br />Tank Nbrk AST -12 Figure Nbr: Figure 2 <br />Description This is the former collection tank for lube oil <br />pumped directly from Locomotive crankcases. <br />Access Route Enter the Yard on East 8th Street. Head south to <br />Description the former diesel shop. Tank is located outside <br />on east side of the desel shop building. <br />Material Welded Steel Product: Empty <br />Dimension 10'dia x <br />33.5' <br />Year Installed': 1965 <br />Base Support! <br />Concrete <br />Longitude, <br />Op90 Thrs Ind; <br />No <br />Period Flood Ind,, <br />No <br />Removal Date <br />Visual, <br />Inventory Method <br />Haz. Waste <br />Response Time: <br />Manifest <br />Over Fill Spill <br />Visual <br />Product Detected <br />Integrity <br />Visual <br />Test Method <br />Failure Probability <br />Flow Direction <br />Contained <br />Discharge <br />Flow Rate <br />Discharge Scenari <br />Description <br />Discharge Detectio <br />System Description <br />Corrosio <br />Paint <br />Protection <br />Description. <br />Secondar <br />Dike <br />Containment <br />Design: <br />Secondar <br />Concrete <br />Containmen <br />Material. <br />Precipitatio <br />Drainage System <br />Runoff Inspection; <br />Dispensing Facility <br />Volume: 20000 <br />Position: Horizontal <br />Annual Usage: 0 <br />Latitude: <br />Port Tank Ind: No <br />Proposed <br />Removal Date: <br />Internal <br />None <br />Heating Coil: <br />Spill Avoid System: <br />Visual, <br />Gauge <br />Response Time: <br />prompt <br />Test Frequency: <br />Daily <br />Failure Type: <br />Sensitive No <br />Environment: <br />Ultimate Discharge 0 <br />Containment Volume: <br />http://home.www.uprr.co*depts/EnvMgmt/Ceps/cfm/Reports/Info_PIan.cfm 11/18/03 <br />