Laserfiche WebLink
Union Pacific Railroad <br />Protection <br />Description' <br />Secondar� <br />Con -vault <br />Containmenk <br />Design <br />Secondar <br />Concrete <br />Containmen <br />Material <br />Precipitation <br />None <br />Drainage System <br />Runoff Inspection: <br />Visual <br />Dispensing Facility Passive inspection conducted each operating day. <br />Inspection Frequency} <br />Comment: <br />Formerly reffered to as AST -2. <br />http://home.www.uprr.co /depts/EnvMgmt/Ceps/cfm/Reports/Info_Plan.cfm 11/18/03 <br />