My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u—'^S nu oconuT <br />O QROE SSlol q <br />/S <br />c.� C) <br />CD M <br />N 04882 <br />EXP. 9 30 ZO4 <br />GIVIL <br />9TH 0F C A��F 0�� <br />1 MI♦n Ili. V Lv <br />Tank In ion: <br />Date of Inspection <br />15 -Nov -03 <br />Time of Inspection <br />1221 <br />833E 8th St, Stockton, Ca 95206 <br />Location <br />Tank plumber <br />TNKO-0294 <br />Documented or estimateo <br />age, <br />10 years old <br />Results of leak tests, int <br />al inspection, or other tank integrity tests <br />None recorded <br />Estimate of remaining s <br />ice life of system <br />10 years <br />inspectio of (description and eval <br />jation of) <br />Tank Integrity; seams, <br />Ids, wall thickness (check for cracks, leaks, corrosion) <br />Good <br />Foundation <br />Concrete <br />Structural Supports <br />Bolted to concrete pad <br />Pressure Controls <br />Air vent w/ overflow to containment <br />Seismic Considerations <br />Bolted to pad <br />Secondary Containment <br />200,000 gal containment <br />Leak detection system <br />visual <br />Not required <br />Corrosion protection me <br />Lsures <br />Spill prevention and ova <br />flow protection <br />visual <br />AncillaryE ui ent: <br />Description of tank syst <br />piping(material and diameters) <br />Steel <br />System integrity(ins <br />on of seams, welds, flanges and connections) <br />Good - leaks <br />None recc orded <br />Results Of pressure tests_[_ <br />_ _ <br />Treatment plant to tank <br />System. configuration <br />None required <br />Structural Supports <br />Corrosion protection m4 <br />-sore -s- <br />Paint <br />-)rip Pads: <br />To sump <br />Sloping <br />Materials of Constructio <br />Asphalt <br />External berm <br />None <br />Hydraulic conductivity <br />Low <br />Good - some minor cracks, minor staining <br />Assessment of Drip Pad <br />me <br />"Visual Inspection for c <br />ks, Ws, corrosion or other deterioration <br />Chemical compatibility <br />Good <br />Leak detections stem? <br />None <br />Other: <br />Collection and conveyance <br />system adequate to prevent run-off <br />IYes <br />Run-on Control <br />Containment <br />Comments and Recommendations: <br />Tank meets all requireme <br />as re uired under 22 CCR 66262.34. <br />O QROE SSlol q <br />/S <br />c.� C) <br />CD M <br />N 04882 <br />EXP. 9 30 ZO4 <br />GIVIL <br />9TH 0F C A��F 0�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.