Laserfiche WebLink
I. PHASING OF PROJECT <br /> Phase Time Period Activity <br /> See table 1 . <br /> SITE CHARACTERISTICS, EXISTING <br /> A. GENERAL <br /> 1. Size of Project Area Approximately 200 acres <br /> 2. Average Slope: 0-58 X , 6-108 , 11-208 , more than 208 <br /> 3. Uses (structures, crops, etc. ) Crops <br /> 4 . Uses in the Immediate Vicinity <br /> Truck terminal, <br /> ,p North Farming & airport South Farming & open fields <br /> East_ Gravel omit West Farming <br /> 5. Property Description (shape, terrain, unique features , etc. ) <br /> Existing farm <br /> 6. Specify waterways or irrigation on property or continguous <br /> property <br /> California aqueduct and Delta Mendota Canal <br /> 7. Specify any easements or utility rights-of-way Two natural gas <br /> pipelines and one transmission line . <br /> B. ENVIRONMENT <br /> 1. Vegetation on site (oaks, riparian vegetation, etc. ) Apricot <br /> and almond orchards and truck crops. <br /> 2. Rare or endangered animals or plants Not aware of any. <br /> 3. Subject to flooding, poor drainage, or other natural hazard <br /> No <br /> 4 . Historic or archaeological resources scenic aspects, or sand <br /> or gravel resources Sand and gravel resource. <br />