Laserfiche WebLink
July 17, 1986 <br /> EXCAVATION & REHABILITATION SCHEDULE <br /> HUCK PROPERTY TRACY, CA. <br /> The following schedule 1s an estimate for the time frame for the <br /> excavation an rehabilitation of the Huck, property near Tracy California. <br /> The time schedule is approximate due to the facts that excavation <br /> will take place according to ecconomic and geologic conditions <br /> encountered and a portion of the pit can not be rehabilitated until that <br /> portion of the pit is completely excavated, We plan on partially <br /> rehabilitating the pit as we go and to finish rehabilitating the different <br /> phases approximately 2 years after completion of the excavation in that <br /> phase. <br /> The purpose of this schedule is to coordinate excavation and <br /> rehabilitation activities. <br /> •4.n� <br /> 1 2 _ 4 5 E. ; _ ? 10 11 1 2 13 14 1 5 1 r. 17 1 ID+ <br /> FH A-,E 1 <br /> 'ECLAt i. } I I <br /> FHA-E 2 <br /> a. <br /> FIECL At 1. <br /> PHASE 7 <br /> F:EC:L At 1. <br /> PH A :E 4 <br /> RECLAt1. <br /> Note: See "Mining Plan" drawing no. 3626 dated 4/7/86 for location of the different phases <br /> TABLE 1 <br />