Laserfiche WebLink
Item No . 3 <br /> PC : 9-4-86 <br /> QX-86-4 <br /> Page 10 <br /> operations, the Department of Public Works may do the work <br /> necessary to restore Corral Hollow Road equal to, or <br /> better than, its original condition, using the funds from <br /> said bond or cash deposit . <br /> 4 . Planninq Division: <br /> a. Excavation into the groundwater aquifer is prohibited. <br /> b. The Excavation and Rehabilitation Plan shall be revised so <br /> that rehabilitation in each phase is commenced prior to <br /> the second year of excavation in that phase . The revised <br /> plan shall be submitted to the Planning Division within <br /> thirty ( 30) days of application approval . <br /> c . Prior to the commencement of operations, the applicant <br /> shall submit to the Planning Division a recorded document <br /> showing that the U. S. Bureau of Reclamation has granted <br /> the applicant a project access easement over the Tracy <br /> Boulevard haul road. <br /> d. The applicant shall comply with the request of Chevron <br /> U. S.A. for work to be performed at the haul road crossing <br /> over Chevron' s 18-inch crude oil pipeline. Prior to the <br /> commencement of operations, the applicant shall submit to <br /> the Planning Division a letter from Chevron stating that <br /> the requested crossing work has been completed. <br /> e. Prior to the commencement of operations, the applicant <br /> shall submit to the Planning Division a financial guaran- <br /> tee for Phase I rehabilitation. The guarantee is to have <br /> been previously approved as to its amount by the <br /> Department of Public Works and as to its form by County <br /> Counsel . The same procedure is to be followed prior to <br /> the commencement of excavation in each subsequent project <br /> phase. <br /> f . The applicant shall submit to the Planning Division an <br /> annual , written report prepared by a licensed civil <br /> engineer . This report shall describe the Phase II <br /> compliance status relative to the requirements of the <br /> County Planning Title and to the conditions of approval <br /> adopted as part of this permit approval . The report shall <br /> also describe the excavation and rehabilitation completed <br /> in the preceding twelve ( 12 ) month period. The first <br /> report shall be submitted April 1 , 1987 . <br /> g. The applicant shall submit to the Planning Division veri- <br /> fication that the project has received all necessary plan, <br />