My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:33:18 PM
Creation date
5/4/2020 12:18:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIGGER& WAD LLC FOR UST Page 1 of I <br /> Path to Closure Plan - Go GEOTRACKER HOME MANAGE PROJECTS EPO <br /> IR RTS SSESSMlocour <br /> DIGGER 8 WAD LLC FORMER UST(70607798080)-MAP THIS sire OPEN-SITE ASSESSMENT <br /> 2478 E.OAK STREET CLE'%Up OVERSIGHTA ENCIES <br /> STOCKTON,CA 95205 A TIVITI REPORT SAN JOAOUINCOUNTY LOP(LEAD)-CASEY'CQTf Tai <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAC E CASEWORKER:AN aSANDO MII .SUPERVISOR:ADRIENNEELLSAESSER <br /> CEMRAL VALLEY R4WCB(REGION%)-CASE Y:00017af <br /> V W EBI I�LE C UMMMY FOR THIS T CASENbRKER:JAMES BARTON-SUPERVISOR:DOM CONDON <br /> CUP Claim 0:18372 CUP Priority Assigned:D CUFAmouMPeM:19 <br /> THIS PROJECT WAS LAST MODIFIED BY ANGEJCA SANOOVA/ AMN ON 1112&20133:04:28 PM-HISTORY <br /> THIS SITE HAS UNAPPROVED SUBMITTALS.CLICK 909 TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan-FY 12/13 THIS VERSION IS FINAL AS OF fUIV?&I3 PATH TO CLOSURE HISTORY ARIRES TPATH To CLOSURE <br /> IMPEDIMENT 1: <br /> General Criteria E:A conceptual site model that assesses the nature,extent,and mobility of the release ❑ Procedural Impediment-INFO <br /> has NOT been developed <br /> Step t0 Rasolve Impediment 1-Step 1:-DELETE STEP <br /> conduct atltlitional site assessment as approved for submitted cork plan to obtain data fox conceptual CDMPLETON DgTE <br /> site me el(CSM). <br /> PROD -TF I � eCTl1AL DATF <br /> a15nm4 <br /> Step to Resolve Impediment l-Step 2: DELETE STEP <br /> Prepare Conceptual site model (CSM). COMPLETION DAIS <br /> PRWECTEDDATE ACTUAL DATE <br /> 10/152014 <br /> ADDADDMONALSTEP_ _.. <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable ❑ Procedural Impediment-Ixso <br /> Step to Resolve Impediment 2-Ste 1:-DF TEP <br /> S <br /> Evaluate necessity to conduct remediation of secondary source based on (faM) COMPLETION DATE <br /> PROJECTEDDATE ACTUAL DATE <br /> 10/152014 !, <br /> Step to Resolve Impediment 2-Step 2:-DELETE STEP <br /> if necessary conduct remediation of secondary source. COMPLETION DATE <br /> PROJ�F TSF ACTUALOATE <br /> 101152016 �— <br /> ADO ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media Specific Criteria-Petroleum Vaoor Intrusion to Indoor Air:The site is NOT considered low-threat for ❑ Procedural Impediment-IEFo <br /> the vapor-Irdruslon-toair pathway and site-specific conditions do NOT satisfy Hems 2a,2b,or 2c. <br /> Conditions that do not meet the policy criteria: <br /> • Soil Gas Samples:No Soil Gas Samples <br /> • TPH in the Bioattenuation Zone:2100 mg/kg <br /> • Bioattenuation Zone Thickness:a 5 Feet and<10 Feet <br /> • 02 Data in Bioattenuation Zone:No 02 Data <br /> • Benzene in Groundwater:a 1,000 pg/I <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soil Gas Naphthalene:Unknown <br /> Step to Resolve Impediment 3-Step 1:-2"M STEP <br /> conduct additional site see estase COMPLETION DATE <br /> approved for submitted workplan to obtain sufficient data to <br /> valuate vapor intrusion hazard and tisk. PROJECTED DATE ACTUAL DATE <br /> 4I15I2014 �— <br /> ADO ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC <br /> GATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND USE SITE CLOSURE <br /> I <br /> FOR CLOSURE•—ICLOSURE INITTAMD BY I DATE fUUMPLETIION DATE DATE <br /> ---DATE-�IODATE IRESTR�ICTIONDATEI DAZE <br /> D]IB Idanti0ed iof Closure Is the date ell Impetllmems to closure have been removed <br /> Save in Progress Save as Final <br /> LOGGED IN ASA MPRIN CONTACT GEOTRACKER HFI P <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_Tolicy.asp?global_id=T... 11/26/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.