Laserfiche WebLink
BROAOB�IV T <br /> 4820 Business Center Drive,$u0e 110 <br /> IT]707-455r119do[Fj�O 863-9046 <br /> broedl�entm CM <br /> Ceeatiny Solutions. Quil[fi�rg Teust- <br /> June 13, 2014 <br /> Project No. 13-90-103 <br /> Re: Addendum to Site Assessment Work Plan, Former ARCO Station No. 443, 2478 E. Oak <br /> Street, Stockton, California; SJCEHD Site Code: RO-1781 <br /> Dear Mr. Morescalchi: <br /> Broadbent&Associates, Inc. (Broadbent) is pleased to submit this Addendum to Site <br /> Assessment Work Plan for Former ARCO Station No. 443 located at 2478 East Oak Street, <br /> California (Site). <br /> The original work plan (Work Plan) that was submitted in November 2013 proposed the <br /> installation of two soil gas wells and two soil borings for the collection of soil and soil gas <br /> samples at the Site. This addendum recommends installation of an additional soil boring SB-2, <br /> between the two previously drilled soil boring locations, identified as SB-26 and SB-27 in the <br /> -- — <br /> attached drawing. This boring will provide additional characterization and a data point <br /> between SB-26 and SB-27. The boring will be installed and sampled using the procedures <br /> identified in the Work Plan. After collecting samples between 0 and 5 feet bgs and another one <br /> between 5 and 10 feet bgs, the boring will be backfilled with cement grout and resurfaced to <br /> the existing grade. This addendum also recommends collection of shallow soil samples from <br /> the borings advanced for soil gas well installation, whenever possible. <br /> The Work Plan had proposed installation of two soil gas wells for collection of soil gas samples. <br /> San Joaquin County Environmental Health Department(SJCEHD) response letter dated January <br /> 6, 2014 required that purge volume tests, leak tests, and soil gas sampling should not be <br /> collected within 48 hours after the soil gas well installation. SJCEHD also recommended that if <br /> the helium shroud used in leak test is infused with tracer helium compound, at least five <br /> minutes equilibrium time should be allowed to be elapsed prior to the sample collection. In <br /> conducting this investigation, Broadbent will follow the recommendations from the SJCEHD <br /> letter. <br /> The Work Plan had indicated that the soil samples will be collected by driving a split-spoon <br /> sampler. However, to avoid potential damage to unidentified utilities, the shallow sample will <br /> be collected in 2 ounce glass jars directly from the hand auger. The deeper sample may be <br /> collected in a similar fashion directly from a hand auger or by using a slide hammer drive tube <br /> assembly. <br /> Broadbent intends to conduct the investigation in accordance with the Work Plan, this <br /> addendum, and SJCEHD letter. Should you have questions or require additional information, <br /> please do not hesitate to contact us at(707)455-7290. <br />