Laserfiche WebLink
Stallt6ec <br /> Work Plan, MW-1S Rehabilitation, and Bulk Extraction <br /> Former ARCO Service Station No. 443 <br /> September 20, 2011 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP affiliated company, for the express purpose stated <br /> above. Any re-use of this report for a different purpose or by others not identified above shall be <br /> at the user's sole risk without liability to Stantec. To the extent that this report is based on <br /> information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> 'SO4AL gF0 <br /> Licensed Approver: o �O� <br /> o; BRIAN D. N <br /> a WESTHOFF 'a <br /> No.8784 <br /> Brian Westhoff, P.G. �,, �Q- <br /> Senior Geologist "T 0 <br /> FOF CI\% <br /> September 20, 2011 <br /> cc: Mr. James Barton, Regional Water Quality Control Board - Central Valley Region <br /> Mr. Sergio Morescalchi, ARC (Upload to Enfos) <br /> Upload to Geotracker <br /> ADDENDUMS <br /> Figure 1 Site Plan <br /> Attachment A SJCEHD Letter dated June 8, 2011 <br /> 443 WorkPlan MW1S Bulk Extraction 2011.doc 3 <br />