Laserfiche WebLink
SITE ASSESSMENT WORK PLAN <br /> Former ARCO Station No.443 <br /> 2478 East Oak Street,Stockton,California <br /> SJCEHD Site Code: RO-1781 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION....................................................................................................................... 1 <br /> 2.0 BACKGROUND INFORMATION.................................. <br /> ............................................................... 1 <br /> 2.1 Site Location........................................................................................................................ 1 <br /> 2.2 Previous Environmental Activities at Site........................................................................... 1 <br /> 2.3 MW-8 Data Review............................................................................................................. 2 <br /> 3.0 PROPOSED SCOPE OF WORK......................... <br /> .......................................................................... 3 <br /> 3.1 Preliminary Activities, Permitting, and Notifications.......................................................... 3 <br /> 3.2 Soil Gas Well Installation.....................................................................................................4 <br /> 3.3 Shut In Test..........................................................................................................................4 <br /> 3.4 Leak Test.............................................................................................................................. 4 <br /> 3.5 Soil Gas Sampling and Analysis....................................................................... .................... <br /> . 5 <br /> 5 <br /> 3.6 Soil Sampling and Analysis .................................................................................................. <br /> 3.7 Field Equipment Decontamination Procedures ..................................................................5 <br /> 3.8 Well Surveying..................................................................................................................... <br /> 5 <br /> 3.9 1 nvestigatio n-De rived Waste............................................................................................... 6 <br /> 3.10 Site Assessment Report..................................................................................................... 6 <br /> 4.0 PROPOSED SCHEDULE..................................................................................................................... 6 <br /> 5.0 LIMITATIONS ...................................................................................................................................7 <br /> 6.0 REFERENCES.....................................................................................................................................8 <br /> DRAWINGS <br /> 1-Site Location Map <br /> 2-Site Layout Plan with Proposed Well and Boring Locations <br /> 3-Soil Gas Well and Sample Train Schematic <br /> TABLES <br /> 1- Historical Soil Analytical Data <br /> 2- Historical Groundwater Analytical Data <br /> ATTACHMENT <br /> MW-8 Well Installation Information <br />