My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:22:43 PM
Creation date
5/4/2020 12:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE ASSESSMENT WORK PLAN <br /> Former ARCO Station No.443 <br /> 2478 East Oak Street,Stockton,California <br /> SJCEHD Site Code: RO-1781 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION....................................................................................................................... 1 <br /> 2.0 BACKGROUND INFORMATION.................................. <br /> ............................................................... 1 <br /> 2.1 Site Location........................................................................................................................ 1 <br /> 2.2 Previous Environmental Activities at Site........................................................................... 1 <br /> 2.3 MW-8 Data Review............................................................................................................. 2 <br /> 3.0 PROPOSED SCOPE OF WORK......................... <br /> .......................................................................... 3 <br /> 3.1 Preliminary Activities, Permitting, and Notifications.......................................................... 3 <br /> 3.2 Soil Gas Well Installation.....................................................................................................4 <br /> 3.3 Shut In Test..........................................................................................................................4 <br /> 3.4 Leak Test.............................................................................................................................. 4 <br /> 3.5 Soil Gas Sampling and Analysis....................................................................... .................... <br /> . 5 <br /> 5 <br /> 3.6 Soil Sampling and Analysis .................................................................................................. <br /> 3.7 Field Equipment Decontamination Procedures ..................................................................5 <br /> 3.8 Well Surveying..................................................................................................................... <br /> 5 <br /> 3.9 1 nvestigatio n-De rived Waste............................................................................................... 6 <br /> 3.10 Site Assessment Report..................................................................................................... 6 <br /> 4.0 PROPOSED SCHEDULE..................................................................................................................... 6 <br /> 5.0 LIMITATIONS ...................................................................................................................................7 <br /> 6.0 REFERENCES.....................................................................................................................................8 <br /> DRAWINGS <br /> 1-Site Location Map <br /> 2-Site Layout Plan with Proposed Well and Boring Locations <br /> 3-Soil Gas Well and Sample Train Schematic <br /> TABLES <br /> 1- Historical Soil Analytical Data <br /> 2- Historical Groundwater Analytical Data <br /> ATTACHMENT <br /> MW-8 Well Installation Information <br />
The URL can be used to link to this page
Your browser does not support the video tag.