My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003878
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
3500 - Local Oversight Program
>
PR0545632
>
ARCHIVED REPORTS_XR0003878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:34 PM
Creation date
5/4/2020 12:30:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003878
RECORD_ID
PR0545632
PE
3528
FACILITY_ID
FA0005176
FACILITY_NAME
FRANZIA WINERY
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
02
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> sampling, latex gloves will be worn to prevent cross <br /> contamination with other samples. One pair of disposable <br /> gloves will be dedicated to each sample collected. <br /> Once the sample is collected, each end of the cylinder will <br /> be sealed with aluminum foil or teflon tape and then capped <br /> with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and <br /> Immediately placed in an ice chest containing dry ice or <br /> frozen chemical ice for delivery to a state certified <br /> laboratory. Sample identification, storage and <br /> ' transportation will be conducted as outlined in the previous <br /> section. <br /> ' 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from <br /> ' excavated material in the manner described in the previous <br /> section, however, a backhoe will not be utilized. If <br /> composite samples are collected, four brass cylinders will <br /> be collected for every 50 cubic yards of material to be <br /> ' sampled unless otherwise specified by the lead regulatory <br /> agency. The samples will be composited by the state <br /> certified analytical laboratory personnel prior to testing. <br /> ' 12.0 Groundwater Sampling Protocol <br /> Prior to arriving at the sampling site, all sampling <br /> equipment will be washed with laboratory grade detergent, <br /> and rinsed twice with tap water, once with acetone, and once <br /> with deionized water. This procedure will be carried out <br /> on-site before sampling of other monitoring wells, if more <br /> than one well is to be sampled with the same sampling <br /> device. <br /> ' .immediately prior to sampling, the depth to water (DTW) in <br /> the well will be recorded. The thickness of product on top <br /> of the groundwater, if present, will be measured using an <br /> ' interface probe. The procedure for monitoring is presented <br /> in Section 9.0 (Groundwater Monitoring Protocol) . <br /> If free product is detected, analysis of groundwater at the <br /> interface for dissolved product will not be conducted. A <br /> product sample will be collected for source identification. <br /> ' If all free product cannot be removed, an interval specific <br /> sampling device may be utilized to collect a sample from <br /> below the zone of free product. Before collecting at least <br /> two groundwater samples from each well, the well will be <br /> ' purged until indicator parameters (temperature, conductivity <br /> and pH) stabilize. This will entail the removal of at least <br /> four well casing volumes by bailing or pumping. The <br /> criteria for determining well casing volumes and temporary <br /> storage of purged water is outlined in Section 10.0, (Well <br /> Development Protocol ) . The indicator parameter measurements <br /> will be taken both before and after purging of each well <br />
The URL can be used to link to this page
Your browser does not support the video tag.