Laserfiche WebLink
MCI <br /> GOARO OF TRUSTEES SAN `5AQUIN LOCAL HEALTH DISTF SERVING <br /> James Culbertson, Prea. City of Lodi <br /> Pairicla E.Vannuccl, Sac y. 1601 East Ha.zeltonAv©nue, P.0. l ox 2049 SenJoaquin County <br /> Anthoshonalllle Van 5pronsen City of Escalon <br /> Earl Plmeniol Stockton,California 95201 City of Manteca <br /> Fern Sugbea 209/460 1178' Cl;yof Ripon <br /> n-n.let L. Flores City of Stockton <br /> �1 O.Mast, M.D. City of Tracy <br /> Vvnllam J.Wade Jo41 Khanna, M.D., M.P.H., D etrlet Health Officer San Joaquin County <br /> Mary Anna Love San Joaquin County <br /> Facility Namerl <br /> Address 1/�IQO_ -- <br /> Date of Inspection S /���G Inspector <br /> MONITORING ALTERNATIVE V A5/-- <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and ` <br /> where the liquid level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full. <br /> This monitoring alternative shall include: <br /> i/ Annual prec7 'ion test on tank and piping. <br /> _Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> t withdrawals. ` <br /> V Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days, <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend). <br /> Liquid level ]measurements are taken at the beginning and end of the <br /> monitoring period (lasting at -least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening.) <br /> If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect,: 2652 of the reguiati'ons and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> Lam' Precision test(s) must be performed by 7��'/ and results submitted to this <br /> office within 30 days of the test. <br /> 102 : Tank Jauging must be started immediately. (See instructions above). <br /> --- --- -- --=the-above-compliance dates-cannot-be met,- <br /> contact-this-office-prior-to-the--specified-nate. <br /> 4/86 i1GT 3 <br /> r <br /> �` Li U� r- <br />