My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012731
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
3500 - Local Oversight Program
>
PR0545632
>
ARCHIVED REPORTS_XR0012731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:35 PM
Creation date
5/4/2020 12:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012731
RECORD_ID
PR0545632
PE
3528
FACILITY_ID
FA0005176
FACILITY_NAME
FRANZIA WINERY
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
02
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ea mpling, latex gloves will beor. to p.....t or... <br /> contamination with other samples. ..one pair of dlaposahln <br /> glows..111 be dedicated to each sample collected, <br /> coca the sample is colLocted, each ad of the cylinder ..All <br /> he sealed with aluminum toll or to Fl on tape and then capped <br /> with a polyethylene lid, taped, antl laboled. The aampla <br /> will then be individually sealed in a ziplack Dag and <br /> Immediately p2acad in an ice choot co ntalning dry ice 0 <br /> frozen chemical ico for dollvery to a state certified <br /> laboratory, S—ILe Id' <br /> 1f1catlon, ator,go and <br /> trenaportatitln will be Conducted as outlined in the oreylo ue <br /> seoti on. <br /> 11.3 Sampling from Sall Piles or Shallow Soil Pits <br /> Soil eampl ea will be collected and transported from 1 <br /> vated material In the man r deserihed in the prev !� <br /> eotlon, however, a backhoan ious <br /> will net be utill zed. <br /> somposit- aamp2as a ..Llect.d, tour braes cylinders wiif <br /> ll <br /> he collected for a ary 50 cubic yards of material to be - <br /> ampied unless otherwise 0p1cified by the lead regulatory <br /> agency. The samples will be compoaitod by the state <br /> ser tlfled analytical laboratory personnel prior to testing, <br /> 12.0 Groundwater Sampling Prot...I <br /> Prior to arriving at the sampling site, all sampling <br /> equipment will he washed with laboratory grade date rg ant, <br /> - and rinsed twice with tap water, once with acetone, antl o <br /> withdeienized water. This procedure will be carried out <br /> on-el to before ...plinq of other monitoring wells, if m <br /> ore <br /> than one well is to be sampled with the same eampllpg <br /> devl ca, <br /> ]mmadl ately prior to ..mpling, the .aryl'. to water (bTW) in <br /> Yha wo11 will be recorded. The thickness of product on top <br /> of the groundwater, if present, will ha ....red: ging an <br /> interface pr�e. Th, procedure for monitoring is prase nted <br /> in Section v,. (Groundwater Monitoring Protocol), <br /> if free product is detected, analyst. of groundwater at the <br /> I n Codecs for dissolved product will not he conducted. A <br /> Product <br /> aampla will be collected for source Identi Election. <br /> i <br /> 1.f.-1111 free product cannot be removed, an interval specific <br /> sem pi ng device may be utilized to collect a ample Erom <br /> JD clow the zone of free product. Before collecting at least <br /> two greendwater aamploa from each well, the well will be <br /> purged until indicator par...ters (temperature, Condu etlytty - <br /> I .ad pk) tabilire. This will entail the re <br /> vel of at 2eaat <br /> k four wall caaing volumes by bailing orpumping• Tho <br /> cr itoria for de terminino well ..sing volume9 and temporary <br /> storage of purged water is audited in Section 10.0, (Well <br /> Development protocol}. The Indicator parameter measurements <br />,. will be taken both hafore and eEto purging of each wall <br />
The URL can be used to link to this page
Your browser does not support the video tag.