My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17717
>
3500 - Local Oversight Program
>
PR0545633
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:10 PM
Creation date
5/4/2020 12:44:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545633
PE
3528
FACILITY_ID
FA0000695
FACILITY_NAME
MOOD-N-FOOD MART
STREET_NUMBER
17717
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
20322020
CURRENT_STATUS
02
SITE_LOCATION
17717 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> GUBARY LIQUORS <br /> 17717 E . HIGHWAY 120 <br /> RIPON CA 95366 <br /> 03/17/99 Three underground storage tanks removed this date under permit <br /> and inspection by PHS/EHD. Soil samples for analysis were <br /> collected. <br /> 03/23/99 Analytical results evidenced petroleum hydrocarbon contamination <br /> beneath tank #2; site failed leaching potential. <br /> 05/25/99 Unauthorized Release Report#99-U42 and Prop 65 #99-076 filed <br /> this date. <br /> 06/11/99 Site placed on Contaminated Site List. <br /> I <br /> 07/23/99 'Work Plan — Preliminary Site Investigation" dated July 13, 1999 <br /> received by PHS/EHD this date. <br /> 07/30/99 Notice of Responsibility and Site Letter sent this date to Ali, Ali <br /> Saheh & Zanaba. Work plan approval letter sent this date, directive <br /> issued for submittal of a well permit application, required permit fee : <br /> and that implementation of the work plan be scheduled. <br /> i <br /> 12/27/99 PHSIEHD correspondence sent this date, directive that the well <br /> permit application and permit fee be submitted, and that notification <br /> is made to PHSIEHD by January 7, 2000 that the fieldwork has i <br /> been scheduled. <br /> 01/31/00 PHSIEHD correspondence sent this date, fourteen-day <br /> enforcement letter. <br /> 03/29/00 PHSIEHD correspondence sent this date, certified mail, notification <br /> that a meeting was scheduled for April 17, 2000 to discuss the <br /> Responsible Party's (RP) status of non-compliance. <br /> 04/17/00 RP failed to appear for scheduled meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.