My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
22107
>
3500 - Local Oversight Program
>
PR0545634
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
5/4/2020 12:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545634
PE
3528
FACILITY_ID
FA0007065
FACILITY_NAME
BENEFICIAL CALIFORNIA
STREET_NUMBER
22107
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
22107 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t - <br /> 1.0 FACILITY DESCRIPTION <br /> 1.1 Climatic Conditions <br /> The climate at the site is characterized by warm, dry suittmers and cool, wet winters. Mean <br /> high l low temperatures are as follows: <br /> Jan. April July Oct. <br /> Mean high temperature °F 60 85 75 70 <br /> Mean low temperature °F 45 55 60 55 <br /> The average wind speed at the site is 5 miles per hour, predominantly from the west. A wind <br /> direction indicator is located on top of a building to the north of the site. <br /> 1.2 Chemicals of Concern <br /> The suspected chemical contaminants at the site are total petroleum hydrocarbons (TPH). <br /> 2.0 RISK ANALYSIS <br /> The major tasks to be completed at the site consist of removing three underground storage tanks and <br /> collecting soil samples according to the sampling criteria set forth by San Joaquin: County. <br /> 3.0 PROCEDURES TO MITIGATE HAZARDS <br /> The following procedures shall be followed on all tasks to reduce mechanical hazard risks: <br /> 1. Stay clear of equipment and machinery; keep clear of steel cables. <br /> 2. Stand out of reach of drill pipe, cables, etc. <br /> 3. Equipment maintenance schedules are (lie responsibility of each individual contractor. <br /> Equipment is checked daily. Equipment deemed unsafe by employees or contractors will be <br /> shut down until repairs are made. <br /> 4. Use personal protective equipment as specified for each task. <br /> 3.1 Electrical Hazards <br /> The following procedures shall be followed on all tasks to reduce electrical hazard risks: <br /> 1. Locate and mark buried utilities before excavation. <br /> 2. Contact power company for minimum clearance from high voltage power lines. Under <br /> no circumstances will any person, equipment, or operation come within 10 feet of <br /> overhead power lines. <br /> 3. If the work area is unavoidably close to buried or overhead power lines, ensure that <br /> power is turned off, with the circuit breaker locked and tagged. <br /> 4. Properly ground all electrical equipment. <br /> S. Avoid standing in water when operating electrical equipment. <br /> 6. If equipment must be connected by splicing wires, first de-energize, lock-out,and tag <br /> equipment, then make sure all connections are taped. <br /> 7. Be familiar with specific operating instructions for each piece of equipment. <br /> 3.2 Chemical Hazards <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.