Laserfiche WebLink
QI - <br /> 15 April 1999 • - <br /> AGE-NC Project No. 98-0520. _. <br /> G - Page 8 of 10, <br /> a chilled container under ice and transported under chain of custody'procedure to'a' DHS certified <br /> laboratory: •, _ <br /> {_ Soil cuttings generated during drilling of the soil borings will-be contained within plastic sheeting - <br /> on the site.for storage. Drums containing decontarnination.water will be.stored<on-site pending .. <br /> appropriate removal; disposal and/or" treatment. <br /> 4.2: __GRAB WATER SAMPLING PROCEDURES: <br /> For the collection of"grab"ground water samples, one soil boring will be advanced to the top of the I <br /> ground water table as identified by collection of a saturated soil-sample. Once groundwater has-been <br /> ` encountered, a disposable bailer will lowered through the hollow'center auger two.to`three feet.into <br /> the water bearing zone. Samples for BTEX;'TPH-g, and fuel oxygenate analyses will be-collected <br /> in laboratory-supplied, 40-m1 .VOA vials containing 0.5=zn1 .of hydrochloric acid as sample <br /> preservative. Samples may-be collected -for TPH-d`.analysis inaaboratory-supplied one-liter.glass <br /> containers. The labeled vials will be placed:in a chilled container.: riderice'and transported under i <br /> ` chain-of-custody to-a DHS-certified laboratory.:- <br /> } <br /> 4.3. MONITORING WELL INSTALLATION-PROCEDURES <br /> The monitoring well boring,will be completed using hollowstem auger-drilling techniques. Soil,-. <br /> borings will be advanced-using a truck'mounted drill rig equipped-with-.hollow-stern augers.-The ' <br /> { - " boring for monitoring wells be advanced.utilizing 8:-inch'augers. Proposed monitoring well design <br /> is illustrated in Figures 3%. <br /> Following completion of the_soil borings,A 2=inch diameter Schedule 401?VC 0-02 inch,slotted.well i <br /> screen and casing will be installed:- A 20-foot section of well 'screen will be installed from a depth' _ <br /> of approximately 10 feet to 30 feet bsg.-The-casing, filter,pack and well sealing materials will be <br /> placed into the borehole through the-interior-of the hollow-stem augers-_After installing the-wel11. <br /> casing, filter pack material consisting,of pre-washed`43 Lones6Y sand will tie added from the bottom =r <br /> of the borehole to approximately two feaabove-the screened interval. Following"placement of the Y <br /> filter pack,the well will be-surged to assist in settling the filter;pack. Adelit'ional sand will be added <br /> if settling occurs:A nominal_l-foot bentonite seal will be placed.above the filter pack:The-bentonite ' <br /> chips will be hydrated with five gailons_of potable water:'The bentonite chips will.be'allowed to _ <br /> --hydrate for a-minimum of dr e-half hour prior to grouting. <br /> The remaining annular spaces will be filled to the ground.surface with a-cement grout:The grout �- <br /> ` mixture will consist of Type_1/II portland•.neat cement-and not more than 10 gallons:of water per . <br /> <x' <br /> i:•, „ a. ,'.'7 - ; - 4 -.4dvt voce!/reef nvironmental,int., . - <br />