My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
220
>
3500 - Local Oversight Program
>
PR0545636
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:11:31 PM
Creation date
5/4/2020 2:09:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545636
PE
3528
FACILITY_ID
FA0009977
FACILITY_NAME
MANTECA WELLS WATER CORP-PRIMARY
STREET_NUMBER
220
Direction
W
STREET_NAME
OAK
STREET_TYPE
ST
City
MANTECA
Zip
95337-5602
APN
21939011
CURRENT_STATUS
02
SITE_LOCATION
220 W OAK ST
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Advanced GeoEnvironmental; Inc. <br /> Site Health and Safety Plan <br /> Page 3 of 7 <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> Location ,rob Function :'Levels of Profeciion <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> Level.D: hard hat <br /> steel-toed boots <br /> half-faced respirator (if necessary) <br /> gloves <br /> safety glasses _ <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No changes of the specified levels of protection i <br /> shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS I <br /> Work party(ies) consisting of two persons will perforin the following tasks: <br /> AGE-A'C SHMverl0/reml3-96 Advanced GeoEnvironmental,-Inc. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.