My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
3500 - Local Oversight Program
>
PR0545637
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:15:43 PM
Creation date
5/4/2020 2:13:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545637
PE
3528
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
02
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. <br /> Horizon's Field Methads and Procedures <br /> 100 cubic yards of soil. All samples collected will be prepared and chilled for transport under <br /> ik <br /> = Chain-of-Custody protocol, and sent to.a State-certified laboratory for the analyses requested. <br /> fF <br /> 4.0 GROUNDWATER GRAB SAMPLES <br /> Groundwater grab samples will be obtained from the excavation using a clean disposable bailer. <br /> The sampyles will be transferred to appropriate clean containers in such a manner as to minimize loss . <br /> of volatile constituents, so that there is no headspace in the sample container and air bubbles are not <br /> present in the samples when they are inverted. If air bubbles are found, resampling will occur. The <br /> samples will be refrigerated and transported promptly to the laboratory. <br /> 5.0 SOIL BORING AND SOIL SAMPLING PROTOCOL <br /> Soil borings and soil sampling will be performed under the supervision of a Horizon geologist. The. <br /> soil borings will be advanced using a truck-mounted hollow-stem auger drilling rig. <br /> To reduce the chances of cross-contamination between boreholes, downhole drilling equipment and <br /> safipling: equipment will be steam-cleaned between borings. To reduce cross-contamination <br /> between samples, the split-barrel sampler will be washed in a soap solution and double-rinsed <br /> between each sampling event. <br /> Soil sampling will be conducted in accordance with ASTM 1586-84. Using this procedure, a split- <br /> barrel sampler (California-type sampler) lined with brass sample sleeves is driven into the soil at <br /> approximately 5-foot intervals by a 140 pound weight falling 30 inches. The number of blow counts <br /> required to advance the sample 18 inches will be recorded at each sample interval. <br /> Upon recovery, a portion of the soil sample will be placed in a plastic bag and.sealed for later <br /> screening with an hNu type organic vapor meter(OVM). Another portion of the soil sample will be <br /> used for classification and description. Generally,:the bottom sample will be sealed in the brass <br /> sleeve and stored at approximately 4'C for transport to the laboratory. After the portion of the soil <br /> sample is;placed in the plastic bag, it will be allowed to warm, inducing volatilization of petroleum <br /> hydrocarbon vapors. The headspace vapors will be screened with the OVM. The highest observed <br /> reading will be recorded on the boring logs. <br /> 6.0 GROUNDWATER DEPTH EVALUATION <br /> Depth to groundwater will be measured to the nearest 0.01-foot using an electronic hand held water <br /> level indicator. The tip of the probe will be examined to evaluate. whether a product sheen is <br /> present. <br /> 7.0 MONITORING WELL DEVELOPMENT/PURGING AND SAMPLING <br /> Following installation, the wells will be surged with a surge block to remove fines from the sand <br /> pack. After surging, ten casing volumes of groundwater will be purged from each well using a <br /> bailer or centrifugal pump to remove sediment and enhance representative sample quality. <br /> Groundwater sampling events conducted after the initial well development will be preceded by <br /> purging a minimum of three well casing volumes as described above. Purge water will be <br /> monitored for the parameters temperature, pH, and conductivity until stabilized. Wells will <br /> recharge to 80% before sampling. If wells dewater, they will be allowed to recharge for a minimum <br /> of one hour prior to sampling. <br /> HORIZON ENVIRONMENTAL INC. <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.