My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PARK
>
248
>
2900 - Site Mitigation Program
>
PR0542235
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:44:24 PM
Creation date
5/4/2020 2:26:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542235
PE
2960
FACILITY_ID
FA0024262
FACILITY_NAME
CANEPA CAR WASH
STREET_NUMBER
248
Direction
E
STREET_NAME
PARK
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
248 E PARK ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CE <br /> T <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> 1125 N. Golden State Blvd. 188 FraM West Circle <br /> November 30, 2000 Suite G Suite I <br /> Turlock, CA 95381 StocktoroA :52Q6 <br /> (209) 668-9256 (2 4-0518 l \ <br /> FAX (209) 668-9257 FAX <br /> Ron Rowe <br /> San Joaquin County PHS/EHD <br /> P.O. Box 388 <br /> Stockton, CA 95202-0388 <br /> Re: Canepa's Car Wash Sites at 6230 Pacific Avenue and 248 E. Park Street, Stockton, California� � <br /> Dear Mr. Rowe: <br /> Condor prepared the Work Plan-Soil Boring and Monitor Well Installation, dated November 17, 1998, <br /> and the Work Plan- Monitor Well Installation, dated November 17, 1998 for the above referenced sites, <br /> respectively. Your approval of the work is pending. Based on our review of the Telephone Call Record of <br /> the conversation you had with Marikka Hughes of Condor Earth Technologies, Inc. (Condor) on <br /> November 27, 2000, Condor believes that you would like new work plans to be submitted for the <br /> Canepa's Car Wash sites. As you are aware, we need regulatory direction to proceed with work and allow <br /> our client, Mr. Remo Canepa,to be reimbursed by the Underground Storage Tank Cleanup Fund. <br /> You requested that the Quarterly Monitoring Reports for the 6230 Pacific Avenue site, address the soil <br /> vapor extraction (SVE) system results and productivity. These concerns will be addressed in the fourth <br /> quarter monitoring report currently being prepared by Condor. In addition, you requested that the work <br /> plan address the groundwater mounding at the site. We propose that a work plan be submitted that <br /> addresses the following: <br /> • Groundwater mounding at the site <br /> • The drowned monitor wells <br /> • Increased concentrations of benzene and MTBE in MW-2 (see enclosed figures from Report: <br /> Quarterly Groundwater Monitoring, Third Quarter-July 2000 dated November 8, 2000) <br /> • Evaluation of SVE system productivity and whether or not this is the best method to close the site <br /> You indicated that the 1998 Work Plan, dated November 17, 1998, for the 248 E. Park Street site has not <br /> been approved because it does not reflect what might be happening outside of that site, specifically a <br /> possible external MTBE plume. You recommended that we do a file review on a site on Hunter Street, <br /> and incorporate the information provided from that site into the work plan. We propose that a work plan <br /> be submitted that addresses the following: <br /> • The drowned monitor wells <br /> • Increased concentrations of benzene in MW-5 (see enclosed figure from Report: Quarterly <br /> Groundwater Monitoring, Third Quarter-July 2000 dated November 9, 2000) <br /> •, Apparent external MTBE source (see enclosed figures from Report Quarterly Groundwater <br /> Monitoring, Second Quarter-April 2000 and Report Quarterly Groundwater Monitoring, Third <br /> Quarter-July 2000, dated September 15 and November 9, 2000, respectively) <br /> We respectfully request written direction for new work plans. <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> http://www.condorearth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.